Laserfiche WebLink
MILL UTILITIES (Replacement Section) <br />Electric Power <br />The mill receives electric power from XCEL Energy. The connected load is about 175HP (130kW). The power is <br />delivered by a 38kV overhead line across the <br />Text continues <br />TAILINGS DISPOSAL (Replacement Section) <br />Operating History <br />A 4.6 acre tailings disposal facility (TSF) was approved and phase 1 of the TSF was constructed in 1990. <br />This first phase facility is located immediately south of the <br />Text continues <br />DUST CONTROL (Original Section, Not Changed or Replaced <br />Dust control of the tailings disposal area is expected to be greatly enhanced by the fact that the pond area is sheltered <br />by a dense growth of pines and is located on the lee <br />Text continues <br />Exhibit D — Reclamation Plan <br />Mill Site Area - Changed <br />Adequate seeding and re vegetation as <br />M1990 -057 September 27, 2011 <br />