September 8, 2011 <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted <br />Y - Air Resource Protection <br />R - Availability of Records <br />R - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />NA - Other <br />NA - Processing Waste <br />C -1992- 080 /Carbon Junction MO <br />Page 2 of 9 <br />COMMENTS <br />V= Violation Issued NA =Not Applicable <br />R - Roads <br />R - Reclamation Success <br />R - Revegetation <br />NA - Subsidence <br />NA - Slides and Other Damage <br />R - Support Facilities On -site <br />R - Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />NA - Topsoil <br />TAK <br />This was a complete inspection conducted by Tom Kaldenbach of DRMS. No one else was present. The <br />field inspection was conducted on the morning of 9/8/11 and the inspection concluded with a records <br />check at the Goff Engineering office in Durango on the morning of 9/9/11. The ground was dry and the <br />site was fully accessible. Selected photographs taken during the inspection are provided at the end of <br />this report. <br />Bond release application SL -4 was partially approved earlier this year, resulting in all of the site being <br />approved for Phase II bond release. None of the site has received Phase III bond release. The SL -4 <br />findings document explained that Phase III bond release requires in the reclaimed areas development on <br />the ground of the approved postmining land uses of industrial or commercial, or residential. The SL -4 <br />decision included a reduction in the minimum required inspection frequency to one complete inspection <br />per calendar quarter. That frequency began in the quarter beginning July 1, 2011. <br />The revegetation success criterion for the bond release area is 90 percent of the cover standard of 40 <br />percent, with 90 percent statistical confidence (permit application page 5 -36). <br />AVAILABILITY OF RECORDS — Rule 5.02.4(1): <br />All required records were on file at the office of Goff Engineering (see attached list). <br />BACKFILL and GRADING — Rule 4.14 ❑ ❑ Contemporaneous Reclamation 4.14.1; Approximate Original <br />Contour 4.14.2; Highwall Elimination 4.14.1(2)(f); Steep Slopes 4.14.2, 4.27; Handling of Acid and Toxic <br />Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br />Backfilling, grading, topsoil replacement, and revegetation has been completed in all areas (with the <br />possible exception of boreholes 94 -1 and 95 -1, which DRMS will research). Borehole 17 -B was reclaimed earlier <br />this year. Borehole 17 -B was located in Carbon Junction Canyon, immediately north of the reclaimed North Pit. <br />Topsoil stockpiles 4 and 7 are not regraded, but were approved as permanent features in June 2010 (TR -16) based <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 1 <br />