My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-13_GENERAL DOCUMENTS - M2008070
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2008070
>
2011-09-13_GENERAL DOCUMENTS - M2008070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:07 PM
Creation date
9/27/2011 9:55:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/13/2011
Doc Name
Solids treatment operation
From
CDPHE
To
Western Gravel LLC
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CD Application Technical Comments #1 September 9, 2011 <br />Western Gravel Disposal Facility Page 5 <br />from CDPHE Guidance document and check/revise Table 7, which appears to be a combination of MQA and <br />CQA for different products (see CDPHE Guidance document). For Piping MQA see the CDPHE Guidance. <br />43. Appendix H Survey Control – Add final cell as -built for top of primary liner. For the final construction <br />report: #6 should include seam testing; #8 should include all CQA testing conducted by the CQA engineer on <br />synthetic materials; #9 add Quality Assurance after "manufacturer"; #10 add sealed by a Professional Land <br />Surveyor licensed in Colorado. <br />44. Appendix I Stormwater – Please revise the presentation to clarify the location of the 43 acre area (provide <br />map) used in the run -on calculations and of the 3.4 acre area used in run -off channel and pond 1 design. Cell <br />A is approximately 4.1 acres. It is unclear if the drainage area used for the Pond 1 capacity included the <br />future west cell or the areas outside of the two cells but north of the road. The run -off volume from Cell A is <br />0.7 ac -ft but Pond 1 is designed for 1.2 ac -ft plus 2 feet for freeboard. Provide (or check accuracy of) the <br />minimum depths for the channels as presented on Figures 9C and 9D. <br />The Division is hopeful that all of the Division comments, verbal and written, will be considered in revising the <br />Application. Additional less formal and somewhat less technical comments were provided in an email dated <br />August 29, 2011 and another email September 9, 2011. Please continue to contact the Division with any questions <br />or concerns. In preparing the revised Application, any significant deviations from the proposed engineering design <br />and operations contained in the March 2011 Application should be identified in the cover letter so that our review <br />of the revised document can be more'efficient. Once the revised Application is received and reviewed the Division <br />will publish a public notice in local newspapers and a 30 -day written public comment period will follow. The <br />Division's final recommendation to the County will not be made until we have reviewed the public comments. <br />Also the Division may request additional information in order to clarify aspects of the revised Application before <br />completing the technical evaluation. <br />In closing, the Division is authorized to bill $125/hr for review of technical submittals pursuant to Section 1.7 of the <br />Regulations. The fee ceiling is $35,000 for review of the Application, which can include time for the completeness <br />review, the technical review and for associated meetings and other communications. An invoice for the Division's <br />review of the document will be transmitted to you under separate cover. Please contact Robert Peterson at 970- <br />248 -7151 if you have questions regarding this correspondence. <br />Sincerely, <br />" VAAD-tia — j <br />Robert Peterson, Environmental Protection Specialist <br />Solid Waste and Materials Management Program <br />Hazardous Materials and Waste Management Division <br />cc: Rio Blanco Co BOCC <br />J. Madison, RBC Planning <br />B. Len, NWCC Inc. <br />T. Marshal, Division of Reclamation Mining and Safety <br />SWRBLWGR 2.1 <br />GJ file <br />
The URL can be used to link to this page
Your browser does not support the video tag.