My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-08-26_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:16 PM
Creation date
9/27/2011 9:55:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
8/26/2011
Doc Name
Fifth adequacy letter (CN-01)
From
DRMS
To
R Squared Incorporated
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geochemistry Review 2 23 August 2011 <br />May Day Conversion CN -1 File No. M- 1981 -185 <br />B. Attachment D -6, Augmentation Pond Construction Work Plan <br />Since the pond is not lined, the Applicant must provide a commitment that no water other than Idaho <br />Spring water will be diverted into the pond. Storm water and overland flow water must be diverted <br />around the pond. <br />C. Attachment D -7, Tailings Geochemical Characterization Work Plan: <br />1) The Applicant must describe the type of testing that will be used to determine the <br />concentrations of Arsenic, Copper, Iron (Fe[II] and Fe[IIIJ), Lead, Potassium, Zinc, and <br />Sulfate. <br />2) ABA: In addition to total sulfur all tests must include sulfide sulfur. <br />3) Humidity Cell Test: The collection of sample material for the tailings humidity cell test must <br />be done with the DRMS geochemist present. The humidity cell test must be conducted under <br />the conditions outlined in the Division's adequacy review of 25 March 2011, i.e., the test must <br />be run indefinitely or until notified otherwise by the division and the analyte list must be as <br />described in the 25 March 2011 review. <br />4) For the "solution characterization method to analyze for pH acidity alkalinity metals anions <br />nitrates minerals cyanides organic carbon and total dissolved solids TDS", the Applicant must <br />describe the analytical methodologies to be used for each. <br />D. Attachment D -8, Whole Rock Sampling and Kinetic Testing Work Plan <br />1) For all solids tests (e.g., SPLP, humidity cell, acid -base accounting, whole rock analyses, <br />solution characterization methods), the Applicant must commit to consulting with the Division <br />prior to the tests to determine appropriate sampling and analytical parameters, including, but <br />not limited to, what is regarded as a representative sample, the appropriate analytical suite for <br />each test, and laboratories that are qualified to perform the tests. <br />2) ABA: In addition to total sulfur all tests must include sulfide sulfur. <br />3) Humidity Cell Test: Collection of sample material for the tailings humidity cell test must be <br />done with the DBMS geochemist present. The humidity cell test must be conducted under the <br />conditions outlined in the Division's adequacy review of 25 March 2011, i.e., the test must be <br />run indefinitely or until notified otherwise by the division and the analyte list must be as <br />described in the 25 March 2011 review. <br />E. Exhibit G — Water Information <br />1) Adequacy Issue #5.A. <br />a) The Applicant states that the point of compliance for groundwater will be the monitoring <br />well located on the May Day No. 2 bench, which appears to be the closest accessible <br />location down gradient of the active mine operation May Day No. 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.