Laserfiche WebLink
Pit No. 1 <br />All values in acre feet <br />Pit No. 5 <br />Month <br />Grand Junction Pipe & Supply Co. <br />Table 2: Monthly Distribution of Consumptive Losses Associated in Mining Operations <br />Gunnison River Pits <br />January <br />February <br />March <br />April <br />May <br />June <br />July <br />August <br />September <br />October <br />November <br />December <br />Annual Total <br />Dust Control <br />Site Roads <br />1 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.34 <br />0.34 <br />0.34 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Dust Control <br />Crusher Operations <br />2 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Moisture Retained in <br />Mined Product <br />3 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.25 <br />0.25 <br />0.25 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.59 <br />1.09 <br />0.59 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />January <br />February <br />March <br />April <br />May <br />June <br />July <br />August <br />September <br />October <br />November <br />December <br />Annual Total <br />Dust Control <br />Site Roads <br />1 <br />0.81 <br />0.81 <br />0.81 <br />0.81 <br />0.81 <br />0.81 <br />0.00 <br />0.00 <br />0.81 <br />0.81 <br />0.81 <br />0.81 <br />Dust Control <br />Crusher Operations <br />2 <br />0.00 <br />0.00 <br />0.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.50 <br />0.00 <br />0.00 <br />0.00 <br />Moisture Retained in <br />Mined Product <br />3 <br />0.28 <br />0.28 <br />0.28 <br />0.28 <br />0.28 <br />0.28 <br />0.00 <br />0.00 <br />0.28 <br />0.28 <br />0.28 <br />0.28 <br />1.09 <br />1.09 <br />1.59 <br />1.09 <br />1.09 <br />1.09 <br />0.00 <br />0.00 <br />1.59 <br />1.09 <br />1.09 <br />1.09 <br />11.90 <br />All values in acre feet <br />(1) Dust control on site roads: <br />Pit No. 1: 5,000 gpd for 22 days per month, or 0.34 ac -ft per month (June through August) <br />(2) Dust control for crusher operations: <br />Pit No. 5: 12,000 gpd for 22 days per month, or 0.81 ac -ft per month (January through June & September through C <br />Pit No. 1: 0.5 ac -ft per month for one month per year (typically July) <br />Pit No. 5: 0.5 ac -ft per month for two months per year (typically March and September) <br />(3) Retained moisture: <br />Pit No. 1: 70,000 tons /year, 72 percent of deposit mined below water table, and 2 percent by weight retained moisti. <br />Pit No. 5: 250,000 tons/year, 76 percent of deposit mined below water table, and 2 percent by weight retained moil <br />(4) Total equals sum of columns 1, 2, and 3 <br />Western Water cs• Land, Inc. <br />