My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-26_PERMIT FILE - X200521710
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200521710
>
2011-09-26_PERMIT FILE - X200521710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:23 PM
Creation date
9/27/2011 8:25:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200521710
IBM Index Class Name
PERMIT FILE
Doc Date
9/26/2011
Doc Name
180 Day Report
From
J.E. Stover & Associates, Inc
To
DRMS
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />1. Attach a map that shows: <br />COAL EXPLORATION 180 -DAY REPORT <br />Prospector: Bowie Resources LLC Notice of Intent No.: CX- 2005 - 217 -10 <br />Address: P.O. Box 483 Project Name: Spruce Stomp Exloration Plan <br />Paonia, CO 81428 County: Delta <br />Date: Septemner 21, 2011 <br />This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34 -33 -101 et seq. The purpose of this report is to update <br />the Division on exploration and reclamation activities that have occurred in the past 180 days <br />of active prospecting. The report also indicates any changes in operations from what was <br />stated in the original Notice of Intent sent to the Division. The Operator may use this form, <br />modify this form, or use a different format altogether. <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocations of holes, <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 <br />days. Mention sealing and plugging, regrading, retopsoiling and reseeding <br />activities. (Attach additional pages, if needed.) <br />No reclamation work was performed during the past 180 days. The road and drill site for DH- 2010 -1 was <br />constructed and drilling has begun. Approximately 0.7 miles of new road were constructed. See Figure 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.