My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-26_HYDROLOGY - C1981014
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2011-09-26_HYDROLOGY - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:22 PM
Creation date
9/27/2011 8:24:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
HYDROLOGY
Doc Date
9/26/2011
Doc Name
3rd Quarter 2011 Pond Inspection Report
From
Energy Fuels Coal, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENERGY FUELS COAL, INC. - SOUTHFIELD MINE - PERMIT NO. C-81-014 <br />PO BOX 459 — 115 EAST MAIN ST <br />FLORENCE, CO 81226 <br />SEDIMENTATION POND INSPECTION FORM <br />Pond L I 1.--DPv 00 - Cm NPDES No, <br />Date of Inspection S PT t 6" I <br />EMBANKMENT <br />1. Adequacy {tithe vegetative cover Excellent. oe't .rate f ew, Poor <br />2. Erosion funning "panics Extensive, Son. Very,e% None <br />3 Is wave action causing pension. <br />On the upstream embankment? <br />Al the prUnipal spillway Mks? <br />4. Erosion of die downstream tot of the embankment? No )< <br />The cease of the erosion is IlliXtheted ter. (Prn\J o y <br />5. Is seepage occurring tlegOtlidi die dam? Yes No k <br />Could this seepage cause potential instability? . Y es No )c. <br />Explain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal 'pubia !. system in working order' Yes X No <br />2. Is the inlet free of debris and resaricuve matenar Yes No <br />3. Is the discharge outlet free of restrictive material? Yes No _ <br />4. LS erosion occurring 2t the discharge outlet' Yes No y' <br />Evaluate the severiry Just &muss (INTO= ) <br />*beet! t\ D <br />3P E 6PCK 0 t- SHEET <br />Inspected by: <br />Yes No...Y.. <br />Yes No)( <br />EMERGENCY SPILLWAY <br />I Is the owned emergency spilling system capeLa of posing design stone discharge? <br />Yes > No <br />2. Doss it appear as it the emergency spillway has discharged water since the lea inspection? <br />Yes P40 X <br />3. Is erosion y? Yes No X <br />Describe the extent <br />SEDIMENT STORAGE. CAPACITY <br />I. thfidliddldstsaf. Wade dtdie icsenvit boa =passed' Yes No )< <br />['yes. explain: <br />Please add airs special cammeats csacandas potentially dimagereas arable= as the hack of this <br />-, qD 6?--FK <br />
The URL can be used to link to this page
Your browser does not support the video tag.