2011-09-26_ENFORCEMENT - C1982056 (2)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1982056
>
2011-09-26_ENFORCEMENT - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:22 PM
Creation date
9/27/2011 8:24:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
ENFORCEMENT
Doc Date
9/26/2011
Doc Name
Revised Abatement Plan (Emailed)
From
Twentymile Coal Company
To
DRMS
Violation No.
CV2011005
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) Work with our contractor to process the imported material currently stockpiled at the Ross Pit <br />to generate three or four separate product streams; 1) coal; 2) trash and debris; 3) coal mine <br />waste (as defined by Rule 1.04 (22a)); and 4) non -coal waste. A portable screening plant will <br />be secured on a temporary basis to facilitate timely processing and efficient segregation of the <br />imported waste materials into these four streams. <br />4) Any coal that is at the Ross Pit, as well as any coal generated during processing of the waste <br />materials, will be returned to the Foidel Creek Mine <br />5) All trash, debris, and non -coal waste will be loaded and transported, by the contractor, to the <br />Twin Landfill for disposal <br />6) All coal mine waste will be loaded and transported, by the contractor, to the Foidel Creek Mine <br />for further processing through the existing Washplant, if appropriate, or will be disposed of in <br />the existing Coal Refuse Disposal Area, if it meets the applicable criteria for disposal, under <br />Rule 4.10 <br />TC proposes to initiate activities 2 through 6, as outlined above, immediately upon approval of this <br />plan by the CDRMS, will proceed diligently to complete these activities in a timely manner, and <br />anticipates that all proposed activities can reasonably be completed within 90 days of initiation. In <br />order to document the proposed activities, TC further proposes to photograph and provide copies of the <br />photos or other appropriate documentation to the CDRMS verifying segregation, transport, and <br />disposal of the materials. <br />In order to prevent any similar occurrences in the future, TC is also reviewing our waste handling and <br />contracting practices to minimize or eliminate the potential for inadvertent mixing of non - compatible <br />wastes, and to track off -site waste haulage and disposal to assure that materials are going to the <br />designated disposal location(s). <br />