Laserfiche WebLink
x- <br />�a <br />0 <br />�z <br />wo <br />2' -6' SOIL /OVERBURDEN <br />30' 51 0 4 <br />SAND /GRAVEL <br />MINING FACE/ <br />VARS. i FSIDE SLOPE <br />TYPICAL BACKFILL RECLAMATION <br />2' -s' <br />S <br />3' / BACKFILL <br />(4" MIN.) <br />TYPICAL CUT AND FILL RECLAMATION <br />NOTES: <br />Overburden backfilling, cut and fill, or a combination of backfilled cut <br />and fill sloping will be used to create final reclaimed side slopes. The <br />approach for final side slope reclamation will be determined as mining <br />progresses and quantities of available overburden and overall pit <br />depths become known in more detail. <br />Final slopes will have a 31-1:1V or flatter slope. <br />The outlet of the reclaimed area will be smoothly feathered into the <br />undisturbed land to the south of the maximum extent of mining and <br />disturbance. <br />Silt fence or other BMPs will be used to control sediment discharge <br />from the pit until the vegetation is developed. <br />SHEET 3 I REGULAR 112 PERMIT AMENDMENT <br />OF <br />FOUNTAIN PIT M- 1982 -155 <br />DATE: January 2011 1 SCHMIDT CONSTRUCTION COMPANY <br />EXHIBIT F -3 <br />RECLAMATION PLAN BLUE EARTH <br />TYPICAL SECTIONS <br />