Laserfiche WebLink
SCALE: <br />/ I <br />GRAVEL PIT ON <br />FT. CARSON <br />r <br />(UNRELATED TO FOUNTAIN PIT) <br />M <br />r <br />_ —5720 <br />—, 5710— <br />--• 5 <br />\ <br />` s0OY <br />�_S690' I <br />\ 442 <br />PROPOSED <br />AMENDMENT <br />AREA <br />r <br />r <br />r <br />PROPOSED <br />AMENDMENT <br />AREA <br />o <br />r I I I I <br />1 g \ c <br />C <br />- <br />0 v <br />" ( / ( 5690 <br />R \ \ \ <br />tg <br />\\ ssso/ l <br />\ ,.5660^ <br />16 <br />,I \ <br />'ss \ / <br />so / <br />0a <br />300 0 300 600 900Feet <br />( IN FEET ) <br />1 inch = 300 ft. <br />LEGEND: <br />— — — Proposed Amendment /Affected Land Boundary <br />SHEET 1 I REGULAR 112 PERMIT AMENDMENT <br />OF3 <br />FOUNTAIN PIT M- 1982 -155 <br />DATE: January 2011 1 SCHMIDT CONSTRUCTION COMPANY <br />'Jo <br />CURRENT GATE INTO <br />FOUNTAIN PIT <br />0 <br />,S <br />'0 <br />0 <br />\\ n <br />NOTES: <br />LOCKED GATE INTO <br />FORT CARSON <br />W11– <br />-CHARTER OAK <br />RANCH ROAD <br />`— ENTRANCE TO <br />AMENDMENT AREA <br />5740 _ <br />CURRENT FOUNTAIN PIT <br />PERMIT M- 1982 -155, <br />BOUNDARY <br />Reclamation Plan assumes that Charter Oak Ranch Road remains in <br />place for public access. <br />Overburden backfilling, cut and fill, or a combination of backfilled cut <br />and fill sloping will be used to create final reclaimed side slopes. The <br />approach for final side slope reclamation will be determined as mining <br />progresses and quantities of available overburden and overall pit <br />depths become known in more detail. <br />Final slopes may be created by cut and fill (see Figure F -3 in <br />Reclamation Plan). <br />Final slopes will have a 3H:1 V or flatter slope. <br />The outlet of the reclaimed area will be smoothly feathered into the <br />undisturbed land to the south of the maximum extent of mining and <br />disturbance. <br />Silt fence or other Best Management Practices will be used to control <br />sediment discharge from the pit until the vegetation is developed. <br />The overburden /topsoil stockpile area will be disced or ripped shallowly <br />after removal of the stockpiles and prior to seeding. <br />EXHIBIT F -1 <br />RECLAMATION PLAN MAP BLUE EARTH i� <br />OPTION 1 <br />r <br />o <br />r I I I I <br />1 g \ c <br />C <br />- <br />0 v <br />" ( / ( 5690 <br />R \ \ \ <br />tg <br />\\ ssso/ l <br />\ ,.5660^ <br />16 <br />,I \ <br />'ss \ / <br />so / <br />0a <br />300 0 300 600 900Feet <br />( IN FEET ) <br />1 inch = 300 ft. <br />LEGEND: <br />— — — Proposed Amendment /Affected Land Boundary <br />SHEET 1 I REGULAR 112 PERMIT AMENDMENT <br />OF3 <br />FOUNTAIN PIT M- 1982 -155 <br />DATE: January 2011 1 SCHMIDT CONSTRUCTION COMPANY <br />'Jo <br />CURRENT GATE INTO <br />FOUNTAIN PIT <br />0 <br />,S <br />'0 <br />0 <br />\\ n <br />NOTES: <br />LOCKED GATE INTO <br />FORT CARSON <br />W11– <br />-CHARTER OAK <br />RANCH ROAD <br />`— ENTRANCE TO <br />AMENDMENT AREA <br />5740 _ <br />CURRENT FOUNTAIN PIT <br />PERMIT M- 1982 -155, <br />BOUNDARY <br />Reclamation Plan assumes that Charter Oak Ranch Road remains in <br />place for public access. <br />Overburden backfilling, cut and fill, or a combination of backfilled cut <br />and fill sloping will be used to create final reclaimed side slopes. The <br />approach for final side slope reclamation will be determined as mining <br />progresses and quantities of available overburden and overall pit <br />depths become known in more detail. <br />Final slopes may be created by cut and fill (see Figure F -3 in <br />Reclamation Plan). <br />Final slopes will have a 3H:1 V or flatter slope. <br />The outlet of the reclaimed area will be smoothly feathered into the <br />undisturbed land to the south of the maximum extent of mining and <br />disturbance. <br />Silt fence or other Best Management Practices will be used to control <br />sediment discharge from the pit until the vegetation is developed. <br />The overburden /topsoil stockpile area will be disced or ripped shallowly <br />after removal of the stockpiles and prior to seeding. <br />EXHIBIT F -1 <br />RECLAMATION PLAN MAP BLUE EARTH i� <br />OPTION 1 <br />