Laserfiche WebLink
11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />An existing adit portal will be rehabilitated to commence underground exploration. An existing <br />shaft will be rehabilitated to provide a secondary escapeway and ventilation circuit. 4 pump <br />test wells will be drilled from the existing pad to define the necessary draw down pumping <br />tale. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 4.00 Average Width 40.00 (ft) Average Length 100.00 (ft) <br />B. Drill Holes: Quantity 4.00 Depth 600.00 (ft) Diameter 12.00 (in) <br />C. Mud Pits: Quantity 4.00 Average Width 20.00 (ft) Average Length 20.00 (ft) <br />Average Depth 8 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />The London Butte Adit was rehabilitated in the late 1980's. The outer 60 feet of the adit <br />required timbering. Surface subsidence indicates approximately 40' has failed and will <br />require repair. Adit will be excavated from the surtace and repaired with large diameter <br />- - - • -- <br />• . 111 . .... .. <br />Iv' i I - 6 <br />F. Other Disturbances (please describe): <br />None. <br />4 (FORM 2 - Public filing) <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />None. <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />