Laserfiche WebLink
September 2, 2011 C-1996-084/Lorencito Canyon Mine DIH <br /> <br /> <br /> <br /> <br /> <br />OTHER (SPECIFY): <br /> <br />A downdrain on Fill 8 was being maintained at the time of the inspection. Mr. Steele was informed that a bit more <br />work below the area of recent maintenance was needed. Mr. Steele was also informed that a gully to the northeast <br />of the recently maintained downdrain needed a bit of repair. Hay bales were observed as having been recently <br />installed at the top of a repaired gully on Fill 5. <br /> <br /> <br /> Part of Fill 8 downdrain that needs maintenance. Hay bales (background) above Fill 5 repaired gully. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br />35 <br />Page of <br /> <br /> <br />