My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-21_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2011-09-21_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:18 PM
Creation date
9/23/2011 7:42:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
9/21/2011
Doc Name
Adequacy Review
From
DRMS
To
Seneca Coal Company
Type & Sequence
RN6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />500.00 <br />0.00 <br />3.00 <br />3.00 <br />2800 <br />0.44 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />500.00 <br />0.00 <br />3.00 <br />3.00 <br />2949 <br />0.33 <br />Scraper Worksheet Cont'd <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />0.830 <br />Task # 001 <br />1.00 Minutes <br />0.60 Minutes <br />NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Total Scraper team cycle time: 2.37 minutes <br />Adjusted for job conditions: 1,218.73 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,218.73 LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production: 2,437.47 LCY/Hour <br />Unadjusted unit production/hour: 1,468.35 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 119.26 Hours <br />Unit cost: $0.563 /LCY Total job cost: $163,605.32 <br />Site Altitude: 7500 feet <br />0.44 minutes <br />0.33 minutes <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />0.830 <br />Task # 001 <br />1.00 Minutes <br />0.60 Minutes <br />NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Total Scraper team cycle time: 2.37 minutes <br />Adjusted for job conditions: 1,218.73 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,218.73 LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production: 2,437.47 LCY/Hour <br />Unadjusted unit production/hour: 1,468.35 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 119.26 Hours <br />Unit cost: $0.563 /LCY Total job cost: $163,605.32 <br />Site Altitude: 7500 feet <br />0.44 minutes <br />0.33 minutes <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.