Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />Equi • ment <br />0.56 <br />0.56 <br />0.56 <br />0.56 <br />0.50 <br />NA <br />0.50 <br />NA <br />2.11 <br />1.11 <br />Mobilization Worksheet Cont'd Task # 025 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: HAYDEN <br />Total one -way travel distance: 25.00 miles <br />Average Travel Speed: 45.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob /Demob Cost ** <br />** one round trip, no haul rig: <br />$8,182.59 <br />$162.56 <br />Total job time: 4.22 Hours <br />Total job cost: $8,345.15 <br />C[RCES Cost Estimating Software <br />