Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />501 <br />502 <br />503 <br />504 <br />505 <br />506 <br />507 <br />508 <br />509 <br />' <br />510 <br />511 <br />512 <br />Rip TAHR <br />RIPPER <br />N N N N N N N N �� .-■ <br />55.40 <br />$30,867.00 <br />$148,576.94 <br />$9,505.00 <br />$48,224.07 <br />$39,744.35 <br />$13,725.38 <br />$22,187.41 <br />$10,035.38 <br />$6,531.99 <br />$17,203.17 <br />$7,865.54 <br />$7,336.79 <br />Remove TAHR Surface Material to Pit <br />SCRAPER1 <br />104.56 <br />Grade TAHR to Blend <br />GRADER <br />79.94 <br />Replace Topsoil from Stockpile A to TAHR <br />Stations 114 to 216 <br />SCRAPER1 <br />33.94 <br />Replace Topsoil from Stockpile C to TAHR <br />Stations 92 to 144 <br />SCRAPER1 <br />27.97 <br />Replace Topsoil from Stockpile D to TAHR <br />Stations 76 to 92 <br />SCRAPER1 <br />9.66 <br />Replace Topsoil from Stockpile E to TAHR <br />Stations 40 to 76 <br />SCRAPER1 <br />15.61 <br />Replace Topsoil from Stockpile F to TAHR <br />Stations 16 to 40 <br />SCRAPER1 <br />7.06 <br />Replace Topsoil from Stockpile G to TAHR <br />Stations 0 to 16 <br />SCRAPER1 <br />4.60 <br />Drill Seed Mix 1 on TAHR <br />REVEGE <br />24.40 <br />Drill Seed Mix 3 on TAHR <br />REVEGE <br />18.80 <br />Drill Seed Cropland on TAHR <br />REVEGE <br />66.90 <br />SUBTOTALS: <br />448.84 <br />$ $361,803.02 <br />Agency or organization name: DRMS <br />COST SUMMARY <br />Task description: Hayden Gulch Loadout Permit Revision 1 Summary Sheet <br />Site: Hayden Gulch Loadout Permit Action: Perm it Revision 1 Permit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 500 State: Colorado <br />Date: 9/16/2011 County: Routt <br />User: JRS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $7,308.42 <br />Performance bond: 1.05 Total = $3,798.93 <br />Job superintendent: 224.42 Total = $13,142.04 <br />Profit: 10.00 Total = $36,180.30 <br />TOTAL 0 & P = $60,429.69 <br />CONTRACT AMOUNT (direct + O & P) = $422,232.71 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.25 <br />6.00 <br />Abbreviation: None <br />Filename: C081 -500 <br />Total = <br />Total = <br />0.00 <br />$17,944.89 <br />$25,333.96 <br />CONTINGENCY: 0.00 Total = $0.00 <br />