Laserfiche WebLink
2) The following maps were not included in the TR78 application and will require an update to reflect <br />the proposed activities. Please provide revised versions of the following maps to incorporate into <br />the PAP. <br />a. Map 23 - Mine Plan <br />b. Map 29 - Reclamation Map <br />Response: Sheet 4 of Map 24 was provided during the 09/13 inspection. Copies of Maps 23 and 29 <br />accompany these responses for replacement in the PAP. <br />3) Revised page 2.05- 45.22, paragraph 1, states that the wildlife consultation is documented by a <br />consultation letter from the CDOW provided in Exhibit 23C. Exhibit 23C was not provided with <br />the submitted application. Please provide Exhibit 23C or revise page 2.05- 45.22. <br />Response: The wildlife consultation letter accompanies these responses for insertion in Exhibit 23C. <br />4) The Division has compiled the attached reclamation cost estimate for the tasks associated with the <br />reclamation of the 15LT Ventilation Shaft Pad and Road. This estimate is sufficient to reclaim all <br />areas associated with the proposed activities under TR77. TCC submitted a reclamation cost <br />estimate in the amount of $34,200.00. The Division's total reclamation costs associated with these <br />activities are estimated to be $57,664.10. The main discrepancy with the Division's estimate and <br />TCC's estimate is the sealing method of the boreholes and the revegetation costs associated with <br />the 8.3 acre disturbance. Please acknowledge if TCC concurs with the Division's estimate. <br />Response: We will accept the Division's cost estimate, which accompanied the Technical Adequacy <br />Comments. <br />