Laserfiche WebLink
Reclamation Costs <br />In order to calculate maximum potential reclamation liability to the State, we have selected a <br />point in time where reclamation costs could be at a maximum. Since the final land use is water <br />storage, that time is prior to any slurry wall construction. Each aspect is listed in the following <br />table with associated disturbed area. Please refer to Exhibit D, Mining Plan, for a listing of <br />disturbed areas that total 15.7 acres. This estimate will follow the same order as the listing in <br />Exhibit D. <br />Treiber Lakes <br />DRMS 112 Permit Application <br />EXHIBIT L <br />Page 22 <br />Aspect <br />Reclamation Operation <br />Quantity <br />Units <br />'Unit Cost <br />I ($) <br />Cost ($) <br />A. <br />Regrading excavation slopes for added stability; assume 20% of slopes regraded to 3H:1 V <br />— 2,000 ft x 79 ft and approximately 300 cubic yards of material moved per linear foot. <br />1. Material graded to 3H:1V <br />22,000 <br />CY <br />0.85 <br />18,700 <br />2. Replace topsoil above maximum <br />water line, 6" x 20 ft x 2,000 ft <br />740 <br />CY <br />0.85 <br />629 <br />3. Seed and mulch <br />1.0 <br />Ac <br />675 <br />675 <br />4. Reseed 20% <br />0.2 <br />Ac <br />675 <br />135 <br />B. <br />_ <br />Slurry Wall Construction; 8,800 ft 50 ft 20 ft <br />1. Construct slurry wall around both <br />lakes, 8,800 ft x 20 ft <br />176,000 <br />SF <br />6.0 <br />1,056,000 <br />2. Grade along slurry wall <br />alignment, 1 ft x 50 ft x 8,800 ft <br />16,300 <br />CY <br />0.85 <br />13,855 <br />3. Replace topsoil along slurry wall <br />alignment, 6" x 50 ft x 8,800 ft <br />8,000 <br />CY <br />0.85 <br />6,800 <br />4. Seed and mulch <br />10.1 <br />Ac <br />675 <br />6,818 <br />5. Reseed 20% <br />2.0 <br />Ac <br />675 <br />1,364 <br />C. <br />Miscellaneous disturbances <br />1. Grading <br />3,000 <br />CY <br />0.85 <br />2,550 <br />2. Seed and mulch <br />2.0 <br />Ac <br />675 <br />1,350 <br />3. Reseed 20% <br />0.4 <br />Ac <br />675 <br />270 <br />Total Disturbance Costs <br />Contractor Mobilization/Demobilization (8 %) <br />Overhead (18.5 %) <br />Administration (5 %) <br />0.08 <br />0.185 <br />0.05 <br />$1,109,145 <br />$88,732 <br />$205,192 <br />$55,457 <br />Total Proposed Financial Warranty <br />$1,458,526 I <br />Disturbed Acreage <br />Financial Warranty per Acre <br />15.7 <br />$92,900 <br />Reclamation Costs <br />In order to calculate maximum potential reclamation liability to the State, we have selected a <br />point in time where reclamation costs could be at a maximum. Since the final land use is water <br />storage, that time is prior to any slurry wall construction. Each aspect is listed in the following <br />table with associated disturbed area. Please refer to Exhibit D, Mining Plan, for a listing of <br />disturbed areas that total 15.7 acres. This estimate will follow the same order as the listing in <br />Exhibit D. <br />Treiber Lakes <br />DRMS 112 Permit Application <br />EXHIBIT L <br />Page 22 <br />