My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-20_REVISION - M1984040
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984040
>
2011-09-20_REVISION - M1984040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:23 PM
Creation date
9/22/2011 7:40:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984040
IBM Index Class Name
Revision
Doc Date
9/20/2011
Doc Name
Receipt of Amendment Appl.- Preliminary Review
From
DRMS
To
Larry Chartier
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Chartier <br />Page 1 <br />September 20, 2011 <br />shorelines should be irregularly shaped to promote a diverse wildlife habitat. The Colorado <br />Division of Wildlife (DOW) must be consulted where wildlife use is the proposed future <br />land use. <br />(e) Specify the reclamation treatment of any waste rock dumps, tailing impoundments, <br />underground mine openings, ditches, sediment control facilities, buildings and other <br />features specified in your mine plan but not previously addressed in the Reclamation Plan <br />narrative. These features must be shown on Exhibit E - Map. This should describe the <br />measures taken to minimize disturbance to the hydrologic balance, prevent off -site damage, <br />and provide for a stable configuration consistent with the proposed future land use. <br />(f) All Limited Impact 110 applications must provide an estimate of the actual costs to <br />reclaim the site based on what it would cost the state using an independent contractor to <br />complete reclamation. Include the unit costs for the following activities as appropriate to <br />the operation: backfilling, grading, topsoil application, seeding, mulching, fertilization, and <br />labor to complete reclamation. Determine and specify the point during the operation when <br />the site has reached a point of maximum disturbance. The cost to reclaim the site to the <br />specifications of the Reclamation Plan at this point must be estimated. Unit costs (cost per <br />cubic yard), volumes, haul or push distances, and grades must be included when backfilling <br />and grading is part of the Reclamation Plan. Volume and unit costs for finish grading, <br />subsoil and topsoil application must be provided in terms of cost per cubic yard. The <br />estimated cost for fertilizer, seed and mulch acquisition and application must be provided <br />as cost per acre. <br />(i) Equipment costs must include such factors as equipment operator wages and <br />benefits, fuel and lubricant consumption and depreciation. The cost to mobilize and <br />demobilize the equipment from the nearest population center should be estimated. <br />(ii) All items referenced in the Reclamation Plan must be included in the cost <br />calculation. These items in addition to earthwork, such as detoxification, building <br />demolition, fencing, monitoring well sealing or stream channel reconstruction must <br />also be included in the reclamation cost estimate. <br />(iii) After the direct costs noted above have been estimated, the Office may add up <br />to an additional maximum eighteen and one -half (18.5 %) percent of that total, <br />which includes private contract, typical overhead costs. This additional cost is <br />required to cover indirect costs that an independent contractor would incur when <br />performing reclamation of the site. Five (5 %) percent additional cost shall be <br />added to cover Office administration cost in the event of bond forfeiture and permit <br />revocation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.