Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />1.00 <br />NA <br />0.50 <br />NA <br />1.72 <br />0.22 <br />Mobilization Worksheet Cont'd Task # 004 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: SPRINGFIELD <br />Total one -way travel distance: 7.00 miles <br />Average Travel Speed: 65.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob /Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Total job time: <br />$4,180.49 <br />$8.48 <br />Total job cost: $4,188.97 <br />3.43 Hours <br />CIRCES Cost Estimating Software <br />