Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Grade 2:1 slope to a 3:1 Slope <br />DOZER <br />��� <br />6.29 <br />$1,249.42 <br />$6,300.18 <br />$8,536.02 <br />$4,188.97 <br />Spreading Topsoil over 12.85 Acres <br />SCRAPER1 <br />8.49 <br />Revegetation of Affected Land <br />REVEGE <br />0.00 <br />Mobilization of Equipment <br />MOBILIZE <br />3.43 <br />SUBTOTALS: <br />18.21 <br />$ $20,274.59 <br />Task description: <br />Site: Gravel Pit No 7 <br />Cost Summary <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 9/19/2011 County: Baca <br />User: JLE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $409.55 <br />Performance bond: 1.05 Total = $212.88 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $2,027.46 <br />TOTAL 0 & P = $2,649.89 <br />CONTRACT AMOUNT (direct + O & P) = $22,924.48 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />COST SUMMARY <br />Permit Action: SO01 Permit /Job #: M1977484 <br />0.00 <br />0.00 <br />5.00 <br />Abbreviation: None <br />Filename: M484 -005 <br />Total = 0.00 <br />Total = $0.00 <br />$1,146.22 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $3,796.11 <br />TOTAL BOND AMOUNT (direct + indirect) = $24,070.70 <br />