My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-16_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-09-16_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 2:21:04 PM
Creation date
9/21/2011 10:22:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
9/16/2011
Doc Name
TR-17 approval
From
DRMS
To
Rio Grande Silver, Inc.
Type & Sequence
TR17
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS <br />Depreciation <br />Ownership Costs <br />CFC <br />Overhead <br />Overhaul <br />Labor <br />Parts <br />Overhaul <br />Field <br />Labor <br />and Operating <br />Repair <br />Parts <br />Costs <br />Fuel <br />Lube <br />Tires <br />sheet 2 of 2 <br />G.E.C. <br />Acquisition cost : <br />$18.35 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Econ.life -Dozer and ROPS : <br />$18.35 <br />NA <br />NA <br />$7.89 <br />$14.36 <br />$8.77 <br />$13.86 <br />NA <br />NA <br />NA <br />NA <br />- Attachment no. 2 : <br />NA <br />NA <br />NA <br />$1.27 <br />$1.35 <br />$2.33 <br />$1.36 <br />NA <br />NA <br />NA <br />NA <br />Annual usage : <br />$27.68 <br />$1305 <br />$12.81 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Double shifts : <br />$20.76 <br />$6.52 <br />$6.40 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Triple shifts : <br />$18.46 <br />$4.35 <br />$4.26 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Mechanic labor -Dozer and ROPS : <br />NA <br />NA <br />NA <br />$4.61 <br />NA <br />$5.12 <br />NA <br />NA <br />NA <br />NA <br />NA <br />- Attachment no. 2 : <br />NA <br />NA <br />NA <br />$0.74 <br />NA <br />$1.36 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Fuel /tube -Dozer and ROPS : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$24.99 <br />$5.41 <br />$0.00 <br />$2.01 <br />Attachment no. 2 : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.35 <br />$0.00 <br />$1.13 <br />ADJUSTED COST SUBTOTALS <br />Dozer, ROPS and Attachment no. 2 : <br />Single shifts : <br />Double shifts : <br />Triple shifts : <br />Depreciation <br />Ownership Costs <br />CFC <br />Overhead <br />$27.68 <br />$20.76 <br />$18.46 <br />$13.05 <br />$6.52 <br />$4.35 <br />$12.81 <br />$6.40 <br />$4.26 <br />Overhaul and Operating Costs <br />Overhaul Field Repair <br />Labor Parts Labor I Parts Fuel Lube I Tires I G.E.C. <br />Dozer and ROPS : <br />$4.61 <br />$0.74 <br />$14.36 <br />$1.35 <br />$5.12 <br />$1.36 <br />$13.86 <br />$1.36 <br />$24.99 <br />$0.00 <br />$5.41 <br />$0.35 <br />$0.00 <br />$2.01 <br />Ripper : <br />$0.00 <br />$1.13 <br />HOURLY OPERATOR WAGES <br />Dozer operator (< 70hp) <br />Dozer operator ( > =70hp) <br />Mechanic <br />Base <br />Rate <br />$23.67 <br />$23.67 <br />$16.74 <br />Fringe <br />Benefits <br />$9.22 <br />$9.22 <br />$4.20 <br />F.I.C.A. <br />7.65% <br />$1.81 <br />$1.81 <br />$1.28 <br />Unempl. <br />6.20% <br />$1.47 <br />$1.47 <br />$1.04 <br />Wk.Comp. <br />10.00% <br />$2.37 <br />$2.37 <br />$1.67 <br />Total <br />($ /hr) <br />$38.54 <br />$38.54 <br />$24.93 <br />Shift Differential <br />Day : <br />Swing : <br />Night: <br />$0.00 <br />$0.30 <br />$0.45 <br />Colorado labor zone : 2 <br />Two shift per day average : <br />Three shift per day average : <br />$0.15 <br />$0.25 <br />HOURLY EQUIPMENT COST SUMMARY <br />Single shifts : <br />Double shifts : <br />Triple shifts : <br />Ownership <br />$53.54 <br />$33.69 <br />$27.07 <br />Operating and Overhaul <br />Machine Attachments <br />$70.36 <br />$70.36 <br />$70.36 <br />$6.29 <br />$6.29 <br />$6.29 <br />Ope ator <br />$38.54 <br />$38.69 <br />$38.79 <br />Total <br />Cost/hr ($) <br />$168.72 <br />$149.02 <br />$142.51 <br />EQUIPMENT SPECIFICATIONS <br />BULLDOZER: <br />Description <br />Transmission <br />Type <br />Weight Length Width Height <br />(UST) (ft.) (ft.) (ft.) <br />Fuel <br />type <br />Horsepower <br />• (thP) <br />Cat D8R Series 11- 8SU (2005) <br />3 -shank ripper <br />NA <br />41.8 <br />BLADE: <br />Description <br />Semi - Universal <br />REAR RIPPER <br />Description <br />Type <br />Adj. Parallelogram <br />Total machine shipping weight : <br />Weight <br />(UST) <br />5.4 <br />Weight <br />(UST) <br />5.4 <br />52.5 <br />22.7 <br />Capacity <br />(cy) <br />11.4 <br />S tons <br />8.7 <br />Width <br />(t) <br />12.9 <br />No. of <br />shanks <br />3 <br />11.5 <br />Height <br />(ft. ) <br />5.5 <br />Shank <br />spacing (ft) <br />3.6 <br />diesel <br />Forward : <br />Reverse : <br />310 <br />Travel speeds (mph) : <br />Gear : 1st <br />2.2 <br />2.9 <br />Beam <br />width (ft) <br />7.1 <br />2nd <br />3.9 <br />5.0 <br />3rd <br />6.7 <br />8.6 <br />Max. rip <br />depth (ft) <br />2.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.