My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-16_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-09-16_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 2:21:04 PM
Creation date
9/21/2011 10:22:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
9/16/2011
Doc Name
TR-17 approval
From
DRMS
To
Rio Grande Silver, Inc.
Type & Sequence
TR17
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT PERFORMANCE DATA <br />Description <br />Horsepower <br />(FHP) <br />Transmission <br />Type <br />Weight <br />(UST) <br />Length <br />(ft) <br />Width <br />(ft) <br />Height <br />(ft) <br />Fuel <br />type <br />Ripper <br />type <br />Dozer : <br />Blade : <br />Attachment no. 1 : <br />Attachment no. 2 : <br />Cat D9R - 9SU (2005) <br />405 <br />NA <br />53.4 <br />22.4 <br />9.6 <br />13.1 <br />diesel <br />NA <br />Semi - Universal <br />NA <br />NA <br />7.2 <br />NA <br />14.2 <br />6.3 <br />NA <br />NA <br />ROPS Cab <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />3 -shank ripper <br />NA <br />NA <br />6.1 <br />3.9 <br />7.7 <br />2.6 <br />NA <br />Adj. Parallelogram <br />ADJUSTED COSTS <br />Acquisition cost <br />Econ.life -Dozer and ROPS <br />- Attachment no. 2 <br />Annual usage <br />Double shifts <br />Triple shifts <br />Mechanic labor -Dozer and ROPS <br />- Attachment no. 2 <br />Fuel /tube -Dozer and ROPS <br />Attachment no. 2 <br />Depreciation <br />$21.02 <br />$21.02 <br />NA <br />$31.72 <br />$23.79 <br />$21.16 <br />NA <br />NA <br />NA <br />NA <br />Ownership Costs <br />CFC <br />NA <br />NA <br />NA <br />$16.94 <br />$8.47 <br />$5.64 <br />NA <br />NA <br />NA <br />NA <br />Overhead <br />NA <br />NA <br />NA <br />$19.11 <br />$9.55 <br />$6.36 <br />NA <br />NA <br />NA <br />NA <br />Overhaul <br />Labor Parts <br />NA NA <br />$8.99 $21.14 <br />$1.32 $0.80 <br />NA NA <br />NA NA <br />NA <br />$5.25 <br />$0.77 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Labor <br />NA <br />$10.52 <br />$2.41 <br />NA <br />NA <br />NA <br />$6.14 <br />$1.41 <br />NA <br />NA NA <br />Overhaul and Operating Costs sheet 2 of 2 <br />Field Repair <br />Parts <br />NA <br />$20.59 <br />$1.82 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Fuel <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$31.57 <br />$0.00 <br />Lube <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$7.62 <br />$0.47 <br />HOURLY EQUIPMENT COST SUMMARY <br />Single shifts : <br />Double shifts : <br />Triple shifts : <br />Ownership <br />$67.77 <br />$41.82 <br />$33.16 <br />Operating and Overhaul <br />Machine Attachments <br />$95.29 <br />$95.29 <br />$95.29 <br />$6.78 <br />$6.78 <br />$6.78 <br />Operator <br />$38.54 <br />$38.69 <br />$38.79 <br />Total <br />Cost/hr ($) <br />$208.38 <br />$182.57 <br />$174.02 <br />Tires <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />G.E.C. <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$2.98 <br />$1.51 <br />ADJUSTED COST SUBTOTALS <br />Dozer, ROPS and Attachment no. 2 : <br />Single shifts : <br />Double shifts : <br />Overhaul and Operating Costs <br />Overhaul Field Repair <br />Labor Parts Labor Parts <br />Dozer and ROPS : <br />$5.25 <br />Attachment no. 2 : <br />Fuel <br />Lube <br />$21.14 <br />$6.14 <br />$20.59 <br />$31.57 <br />$7.62 <br />$0.00 <br />Tires G.E.C. <br />$2.98 <br />Triple shifts : <br />Depreciation <br />$31.72 <br />$23.79 <br />Ownership Costs <br />CFC Overhead <br />$16.94 <br />$8.47 <br />$19.11 <br />$9.55 <br />$21.16 <br />$5.64 <br />$6.36 <br />$0.77 <br />$0.80 <br />$1.41 <br />$1.82 <br />$0.00 <br />$0.47 <br />$0.00 <br />$1.51 <br />HOURLY OPERATOR WAGES <br />Dozer operator (< 70hp) <br />Dozer operator( > =70hp) <br />Mechanic <br />Base <br />Rate <br />$23.67 <br />$23.67 <br />$16.74 <br />Fringe <br />Benefits <br />$9.22 <br />6.20% <br />$1.47 <br />$9.22 <br />$4.20 <br />F.I.C.A. <br />7.65% <br />$1.81 <br />$1.81 <br />$1.28 <br />Unempl. <br />$1.47 <br />$1.04 <br />Wk.Comp. <br />10.00% <br />$2.37 <br />$2.37 <br />$1.67 <br />Total <br />($ /hr) <br />$38.54 <br />$38.54 <br />$24.93 <br />Shift Differential <br />Day : $0.00 <br />Swing : <br />Night: <br />$0.30 <br />$0.45 <br />Colorado labor zone : 2 <br />Two shift per day average : $0.15 <br />Three shift per day average : <br />$0.25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.