Laserfiche WebLink
Exhibit C - PRE MINING MAP <br />No change. Company name changed by succession of operator in <br />2005. See Map Pocket. <br />Exhibit C -1 - MINING PLAN MAP <br />Revised map included. See Map Pocket. <br />Exhibit D <br />MINING PLAN <br />Unless specifically discussed below, the methods described <br />and approved in the original 1988 permit and 2000 amendment <br />applications, mining and reclamation plans will remain unchanged. <br />The current bond is $51,400. <br />There are no changes to the mining method as approved in the <br />current plan. The primary reason for this amendment is to change <br />the final reclamation on 289.75 acres ± located in part of old <br />Phase 2 (Sec. 35, T -11 -N, R -67 -W) of the approved plan from <br />rangeland to a rail transload and storage yard. Additional minor <br />changes to the final reclamation are discussed in Exhibit E, <br />Reclamation Plan. <br />Changes affecting the mining operation include removing the <br />centrally located Plant Site and processing area, and replacing <br />the former large stationary plants with temporary processing <br />equipment that will move with the remaining active mining. The <br />35.0 acres of disturbed area will remain but will become a moving <br />area containing 10.0 acres of portable plant site, 3.70 acres of <br />temporary equipment storage area and 21.30 acres of stripped, <br />partially mined and partially reclaimed areas. See the Mining <br />Plan Map for typical layout of this area. <br />PHASE NAME CHANGES <br />This amendment will rename old Phases 1, 2, 3, & 4 into one <br />phase and be referred to as the North Area. The old Phases 5 & 6 <br />will be renamed the South Area. The North Area consists of <br />approximately 901 acres and the South Area consists of approxi- <br />mately 511 acres. Attached is Figure D -1, showing the renamed <br />phases. <br />Mining has ended on the North Area of the operation and most <br />of the area has been revegetated. There is some reprocessing of <br />materials that have been removed from the old Plant Site. Of the <br />approximate 901 acres ± contained in the North Area, we are <br />changing the final end uses on an area covering approximately <br />303.00 acres ±. Of this area 280.0 acres will be Transload Area, <br />9.75 acres is the Equipment Storage area, and 13.25 acres will be <br />property access roads. Mining has progressed into the South <br />3 <br />