• Soils engineer to observe, segregate suitable embankment material, and test placement of <br />embankment fill during construction. <br />Clay Material Segregation and Clay Liner Construction <br />• Performed by contractor, monitored by Mill Superintendent and/or Owner's Engineer. <br />• Soils engineer to segregate suitable clay liner material while observing placement of <br />embankment fill during construction. <br />• Grade top of clay liner on interior slope and bottom of impoundment ( +/- 1") on 50' grid. <br />• Monitor clay liner compaction lifts, compaction equipment in conjunction with contract <br />soils engineer. <br />• Soils engineer to test placement of clay liner compaction during construction. <br />• One compaction test conducted for every 2,500cy of clay liner placed. <br />Leak Detection and Sump Construction <br />• Performed by contractor, monitored by Mill Superintendent and/or Owner's Engineer. <br />• Layout and grade detection layer subdrain system. <br />• Layout and grade detection layer collection sump system. <br />• Grade top of detection layer on interior slope and bottom of impoundment ( +/- 1/8 ") on <br />50' grid. <br />• Daily check of sub base for geomembrane liner placement. <br />Impoundment Liner Installation <br />• Performed by contractor, monitored by Mill Superintendent and/or Owner's Engineer. <br />• Layout and grade anchor trench for geomembrane liner. <br />• Liner material contractor will inspect the substrate and anchor trenching prior to <br />commencing installation. <br />• Panel installation will occur in reasonably clam weather conditions with ambient <br />temperatures in excess of 40 degrees F and no precipitation. <br />• Sample seams will be made on a daily basis to establish a proper film bond tear. <br />• Seaming crews will overlap the material + / -6in and construct a minimum 2in wide fully <br />bonded seam without wrinkles or voids. <br />• If wrinkles occur, the seam will be cut and patched accordingly, a minimum of 4in <br />beyond the problem seam in all directions. <br />• Field seams will be tested by the air -lance method per ASTM Method D4437. Where <br />visual or audible signs occur, the area will be repaired. <br />• Destructive samples will be taken every 1,0001f of seam from the material in the trench <br />area. At least 2 samples will be taken if less than 2,0001f of seam installed. <br />• Destructive samples will be sent to a lab for testing (peel and shear). The test values will <br />be a minimum of 80% of parent material strength. <br />• The liner contractor shall supply daily reports to the Owner. <br />Geotextile Liner Installation <br />• Performed by contractor, monitored by Mill Superintendent and/or Owner's Engineer. <br />• Layout geotextile liner on polypropylene liner on impoundment bottom. Panels will <br />overlap adjacent panels lft. <br />M1990 -057 September 16, 2011 <br />