Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 014 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one -way travel distance: 120.00 miles <br />Average Travel Speed: 45.00 mph <br />Transportation Cycle Time: <br />Non - Roadable <br />Equipment <br />Haul Time (Hours): 2.67 <br />Return Time (Hours): 2.67 <br />Loading Time (Hours): 2.00 <br />Unloading Time (Hours): 1.00 <br />Subtotals: 8.33 <br />JOB TIME AND COST <br />Total Non - Roadable Mob/Demob <br />`* two round trips with h <br />Total Roadable Mob/Demob <br />Cost * <br />Sul rig: <br />ost ** <br />** one round trip, no haul rig: <br />Roadable� <br />Equipme t <br />2.67 <br />2.67 <br />NA <br />NA <br />5.33 <br />Total iob time: <br />$12,417.19 <br />$594.83 <br />Total job cost: $13,012.02 <br />16.67 Hours <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />