My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-16_REVISION - C1981033 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2011-09-16_REVISION - C1981033 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:12 PM
Creation date
9/19/2011 1:28:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
9/16/2011
Doc Name
Proposed Decision Letter
From
DRMS
To
Gunnison County Clerk and Recorder
Type & Sequence
SI1
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bear Mine <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 7/1/2011 <br />User: SLB <br />Cost Breakdown: <br />HYDRAULIC EXCAVATOR WORK <br />Backfill and regrade portal bench and access road <br />Permit Action: NA - New CIRCES <br />Program Rollover <br />State: Colorado <br />County: Gunnison <br />Agency or organization name: Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 325C L Horsepower: 140 <br />Attachment 1: ROPS Cab Weight (MT): 28.18 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />$31.95 <br />$50.75 <br />$38.67 <br />$121.37 <br />Total Fleet Cost/Hour: $121.37 <br />MATERIAL QUANTITIES <br />Initial volume: 3,887 CCY <br />Loose volume: 3,887 LCY <br />Load Bucket Capacity <br />Utilization % <br />NA <br />100 <br />NA <br />Swell factor: 1.000 <br />Abbreviation: None <br />Source of estimated volume: Division of Reclamation, Mining & Safety estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: BELOW AVERAGE <br />Secondary Job Condition within Basic Description: AVERAGE <br />Cycle Time Value: 0.335 minutes <br />Rated Capacity: 2.22 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90 %) 0.850 <br />Adjusted Capacity: 1.89 LCY <br />Bucket Size Class: Medium <br />Job Condition Correction Factors Site Altitude: 6000 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 337.97 LCY/Hour <br />Adjusted Hourly Unit Production: 280.52 LCY /Hour <br />Adjusted Hourly Fleet Production: 280.52 LCY/Hour <br />Filename: CO33 -002 <br />Unit cost: $0.433 /LCY Total job cost: $1,682.00 <br />Permit/Job #: C1981033 <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: 13.86 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.