Laserfiche WebLink
Table 3 <br />VALCO, INC. <br />SWSP ACCOUNTING PROJECTION <br />Rocky Ford East Pit <br />(all values in acre -feet unless otherwise indicated) <br />Notes: Shaded months correspond with projection data, non-shaded months correspond with actual data. <br />[1] Total cxposcd groundwater surface arca in the pit. Increases to the July 2005 measured area are estimated by Valco. <br />[2] Total gravel mined below the groundwater table as reported by Valco. <br />[3] Well pumping measured with totalizer. Meter reading reported by Valco. <br />[4] Required evaporative replacement based upon the following: Equals ([1] - 17.4 ac) x 4.0211 x monthly%. <br />17.40 ac = pre -l981 exposed groundwater surface arca (does not require augmentation) <br />4.02 feet = annual net evaporation rate at the site <br />[5] Water in mined gravel is 4% by weight of the gravel produced. Equals [2] x (1/1359 af/ton of water) x 4 %. <br />[6] Well pumping converted to acre-feet. Equals [3]/(325,851 gal/af). <br />[7] Total unlagged depletions requiring replacement. Equals [4] + [5] + [6]. <br />[8] Annual lagging pattern for depletions to the Arkansas River. <br />[9] Lagged depletions to the Arkansas River. The monthly amounts will change slightly as the projected total changes. Equals [7] x [8]. <br />[10] Consumptive use credit from 2 Rocky Ford Ditch shares. <br />[11] River transit loss applied to excess Canon City and Oil Crock Ditch Credits that are used to augment depletions at Rocky Ford. <br />[12] Excess Canon City and Oil Creek Ditch credits used at the Rocky Ford site (reduced by transit loss). Equals (Canon City Table [101) x (100% - [111). <br />[13] Pueblo Board of Water Works scheduled release for Rocky Ford East Pit. <br />[14] Required Pueblo Board of Water Works lease volume needed to replace remaining depletions. Equals greater of zero and [9] - [ 10] - [121, <br />[ 15] Remaining Depletions ( -) or Surplus Credit (+) after accounting for replacement sources. Equals [10] + [12] + [ 13] - [9]. <br />BBA • <br />., r:at rr cnnsnhuui B /SH,fl'.B HOQof N ASSOi:!Ar INC. <br />105500.v.1.02011.202 AtumnIInk° • SWSP RIfceli, AtmmIIlN 241.21112.M% Amin; Fran <br />5/012011 1;18 I'M LWiI <br />Operations <br />Replacement <br />Requirement <br />Ditch Credit Replacements <br />_ PBWW Lease <br />Exposed ` <br />CC &OC Excess CC& <br />Remaining <br />Water <br />Gravel <br />Batch Plant <br />Net <br />Water in <br />Batch <br />Total <br />Total <br />Rocky Ford <br />Ditch <br />OC Ditch <br />Depletions <br />Surface <br />Production <br />Pumping <br />Evaporative <br />Mincd <br />Plant <br />Unlagged <br />Lagging <br />Lagged <br />Ditch CU <br />Transit <br />CU Credit <br />Requested <br />Required <br />( -) /Surplus <br />Month <br />(ac) <br />(tons) , <br />(gallons) <br />Depletions <br />Gravel <br />Pumping <br />Depletions <br />Pattern <br />Depletions <br />Credit <br />Losses <br />Used at RE <br />_ Amount <br />Amount <br />Credit ( +) <br />[11 <br />al <br />[31 <br />L41 <br />151 <br />[61 <br />[71 <br />181 <br />191 <br />[10] <br />1111 <br />[121 <br />113] <br />[14] <br />[15] <br />June 'il :. <br />, 47 3 <br />. ". 4 ;000 • <br />, <br />0 : <br />17.43. <br />012. ' <br />.' 0.00 <br />17.55 <br />9.43% <br />11.47 <br />7.47 <br />...' 5.62% '' <br />j.10 ; <br />.3::1:',, ° <br />,2:. <br />July <br />47.3' <br />:' 4,000. <br />0 , <br />18.03 <br />0.12 <br />0 00`' ' <br />. 1 <br />%. <br />9.49% <br />9.49 <br />,. 11.54 <br />9.80 <br />5.62% <br />1:87 - <br />:0.90' <br />6:0 <br />104 <br />August <br />47 .1 . <br />4,000 <br />0 . <br />16.23 <br />' ''0 1 <br />' ` 0.00 ' <br />16.34 <br />'9.40%. <br />11.43 <br />$ 17 <br />5 62% <br />1 15 <br />27.9 r <br />2 11 <br />0 68 <br />September <br />'47.3 <br />4000 <br />0 '. <br />1202 <br />. , 0.12 <br />0.00 <br />12.14 • <br />" '- <br />9.22 %. <br />11 22 <br /># -3'46 <br />.,1.;5 62% <br />0 39,,; <br />a 7. <br />7 3 <br />U47 <br />October . <br />; .47.3 - <br />4,000 ..- <br />0 , ; <br />8.41' ' <br />0 12 <br />0 00 <br />8 53 t <br />- 8.85 %'. • .. <br />10.76 <br />-0.70 <br />5.62% , <br />0.00.. <br />1 <br />1446 <br />0.30 <br />. November'; <br />47.3' <br />' 4,000 "' <br />0 <br />'.4 81 <br />0.12 <br />.0 00 <br />; 4.93 <br />8:05% <br />9.80 <br />1 13 <br />5 43% <br />0 ,00 <br />1105 <br />10 93 <br />013 ; <br />December <br />47.3 <br />4,000 J <br />:0'... <br />3.61 .. <br />012 <br />0.00. <br />3.72 -; <br />7.34% <br />8.93 <br />-1, 08 <br />543 %1 <br />:' 000: `' <br />10.'09 <br />"`10 <br />008 <br />. Janutuy'' 12 <br />47.3 ' <br />' 4,000 <br />0 . = <br />3.61 <br />0,12 <br />0 00 : <br />3.72 '' <br />6.90% <br />, • 8.39 <br />-j. <br />. 5.43% <br />0 00 , <br />9.47., <br />9.39•, <br />fl 08 1 ; <br />t ' <br />:February' <br />47.3 <br />. 4,000 • <br />0 <br />4.21 <br />0.12 <br />0.00 <br />4.32 <br />6.80% <br />; 8.27 <br />-0 93 <br />`5 <br />0 00 <br />;9 32 <br />9 20 <br />011 <br />. March <br />47 .3 <br />4,000 <br />0 '• <br />6.61 <br />0.12 <br />0.00 .' <br />6 73 : '" <br />7.27% <br />8.84 <br />4 82 <br />5 43% <br />0 0 . s1 <br />89 <br />9 66 r <br />0 23 <br />April <br />47 3 <br />4,000 <br />0 <br />10.82 <br />012 <br />000 <br />10 94 <br />� ° <br />8.20% <br />.9.98 <br />d 1 <br />0 10 <br />SA3% <br />0 00 ; <br />yI <br />L� 50 <br />10 08 <br />0 42 <br />. <br />Mar '.. <br />47 3 <br />�;�000 <br />.,. k Ira': <br />a ' 14142 <br />;. 2 <br />0 <br />��. .� <br />0 00 <br />a 14:54::, <br />. % <br />9:03 , <br />: ,10.98 . <br />2 SS <br />5 2 <br />,6°10, <br />, . ,0,00, "`9:00, <br />8 40. <br />0 .59 <br />Annual Total <br />48,000 <br />0 <br />120.20 <br />1.41 <br />0.00 <br />121.61 <br />° <br />100% <br />121.61 <br />25.72 <br />4.51 <br />96.25 <br />91.52 <br />4.87 <br />Table 3 <br />VALCO, INC. <br />SWSP ACCOUNTING PROJECTION <br />Rocky Ford East Pit <br />(all values in acre -feet unless otherwise indicated) <br />Notes: Shaded months correspond with projection data, non-shaded months correspond with actual data. <br />[1] Total cxposcd groundwater surface arca in the pit. Increases to the July 2005 measured area are estimated by Valco. <br />[2] Total gravel mined below the groundwater table as reported by Valco. <br />[3] Well pumping measured with totalizer. Meter reading reported by Valco. <br />[4] Required evaporative replacement based upon the following: Equals ([1] - 17.4 ac) x 4.0211 x monthly%. <br />17.40 ac = pre -l981 exposed groundwater surface arca (does not require augmentation) <br />4.02 feet = annual net evaporation rate at the site <br />[5] Water in mined gravel is 4% by weight of the gravel produced. Equals [2] x (1/1359 af/ton of water) x 4 %. <br />[6] Well pumping converted to acre-feet. Equals [3]/(325,851 gal/af). <br />[7] Total unlagged depletions requiring replacement. Equals [4] + [5] + [6]. <br />[8] Annual lagging pattern for depletions to the Arkansas River. <br />[9] Lagged depletions to the Arkansas River. The monthly amounts will change slightly as the projected total changes. Equals [7] x [8]. <br />[10] Consumptive use credit from 2 Rocky Ford Ditch shares. <br />[11] River transit loss applied to excess Canon City and Oil Crock Ditch Credits that are used to augment depletions at Rocky Ford. <br />[12] Excess Canon City and Oil Creek Ditch credits used at the Rocky Ford site (reduced by transit loss). Equals (Canon City Table [101) x (100% - [111). <br />[13] Pueblo Board of Water Works scheduled release for Rocky Ford East Pit. <br />[14] Required Pueblo Board of Water Works lease volume needed to replace remaining depletions. Equals greater of zero and [9] - [ 10] - [121, <br />[ 15] Remaining Depletions ( -) or Surplus Credit (+) after accounting for replacement sources. Equals [10] + [12] + [ 13] - [9]. <br />BBA • <br />., r:at rr cnnsnhuui B /SH,fl'.B HOQof N ASSOi:!Ar INC. <br />105500.v.1.02011.202 AtumnIInk° • SWSP RIfceli, AtmmIIlN 241.21112.M% Amin; Fran <br />5/012011 1;18 I'M LWiI <br />