Laserfiche WebLink
Piezometer <br />Date <br />Depth to Water <br />(feet) <br />Total Depth (ft) <br />Volume of <br />Water (ft) <br />P12 <br />8/31/11 <br />41.70 <br />41.71 <br />0.01 <br />P13 <br />8/31/11 <br />40.97 <br />41.34 <br />0.37 <br />P14 <br />8/31/11 <br />Dry <br />41.24 <br />0.00 <br />P15 <br />8/31/11 <br />40.91 <br />41.10 <br />0.19 <br />Date <br />Quantity <br />Sludge Management <br />May 2011 <br />90 tons <br />Transferred sludge from drying pad to <br />Tailings impoundment. <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M -88 -112 <br />August 2011 Monthly Report <br />Page 3 <br />Table 2 — August 2011 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Table 3 below provides the calendar year 2011 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379 -0798 or Mr. Bill Lyle (303) 324 -2630. <br />Si <br />er 1y, <br />Julio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />File <br />