Laserfiche WebLink
Continue geomembrane exposure within the Phase 5 VLF. <br />Continue installation of the high volume solution collection system within the Phase 5 VLF. <br />Continue DCF placement within the Phase 5 VLF. <br />Continue leak detection system installation within the Phase 5 VLF. <br />Continue 80mil primary geomembrane acceptance within the Phase 5 VLF. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V: <br />CC &V held a weekly construction meeting on August 30, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. Geomembrane pre - construction topics were also <br />discussed during the meeting. <br />Ames Construction: <br />None <br />AMEC: <br />None <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />��' <br />I <br />September 3, 2011. <br />Joseph Hickey, CQA Moni to <br />Approved By: <br />ate: September 3, 2011 <br />Date: g , /f 2/ J <br />ame <br />p <br />VLF Weekly Report WE 09.03.2011 <br />