GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue subgrade acceptance prior to SLF placement within the Phase 5 VLF. <br />Continue SLF placement within the Phase 5 VLF <br />Continue subgrade acceptance prior to geomembrane deployment within Phase 5 VLF. <br />Continue geomembrane installation within Phase 5 VLF. <br />Continue obtaining samples and assisting in the process of DCF material at the DCF Process area. <br />Continue excavation and backfill of the existing (temporary) anchor trench within the Phase 5 VLF. <br />Continue geomembrane exposure within the Phase 5 VLF. <br />Continue installation of the high volume solution collection system within the Phase 5 VLF. <br />Continue DCF placement within the Phase 5 VLF. <br />Continue leak detection system installation within the Phase 5 VLF. <br />Continue 80mil primary geomembrane acceptance within the Phase 5 VLF. <br />Summary of Non- conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V: <br />CC &V held a weekly construction meeting on August 23, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. Geomembrane pre- construction topics were also <br />discussed during the meeting. <br />Ames Construction: <br />None <br />AMEC: <br />None <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />amecs <br />We trust the information provided clearly represents our findings and observations for the week ending <br />August 27, 2011. <br />Joseph Hickey, CQA Monitor Date: August 27, 2011 <br />Approved By: <br />Date: 31 4u6.4( <br />VLF Weekly Report WE 08.27.2011 <br />