Laserfiche WebLink
acres, backfilled to two feet above the average ground water elevation came to over <br />$3,000,000.00. The letter sent in 2005 explaining the cost is included in this adequacy <br />letter. <br />2) The operator is correct, once the Division receives the approved QA /QC report from the <br />State Engineer, the required warranty for the slurry wall will be 20% of the cost of <br />construction. Since the operation is going to be in Temporary Cessation and the Division <br />is required to hold a financial warranty for the site that is adequate to cover the cost of <br />current affected area and area expected to be affected the next year, at this time no <br />additional warranty will be needed. Prior to commencement of the operation, Pete Lien <br />& Son will submit a Technical Revision addressing the slurry wall. This amendment will <br />be approved with conditions requiring Pete Lien and Son to submit a revision prior to <br />commencement of operation. <br />If you have questions, please contact me at 303 866 3567 ext 8129. <br />Sincerely <br />erhan Keffelew <br />Environmental Protection Specialist <br />CC: Tony Waldron <br />1 <br />