Laserfiche WebLink
EMERGENCY; SPILLWAY: <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? <br />Yes No <br />2). Is erosion occurring at any section of the emergency spillway? <br />Yes <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes ., No <br />Date <br />Explain: <br />OTHER OBSERVATIONS <br />P a - vi feyVI ct(ft S <br />p pe CI D <br />MSHA Qualified Imp <br />ndment nspector <br />191, //knIP <br />