Laserfiche WebLink
accumulated in these ponds such that capacities are below 50 percent of design capacity (based on <br />storage capacity at the invert of the primary outlet spillway). No other ponds appear to have <br />existing capacities below this level. Therefore, the Division concurs with Colowyo's assessment <br />for the need for sediment removal from these two ponds but not the others. <br />Please contact me at Rob.Zuber@state.co.us or 303 - 866 -3567 (extension 8113) with questions or <br />comments. <br />Sincerely, <br />Robert D. Zuber, P.E. <br />Environmental Protection Specialist <br />