Laserfiche WebLink
U. S. DEPT. OF THE INTERI <br />OFFICE OF SURFACE MI fNG <br />Mine Site Evaluation SEP .o <br />State Program amt, <br />Mining and Safety <br />1. Person/Permittee <br />GEC MINERALS INC <br />2. Address <br />C/O HARRISON WESTERN <br />3. City 4. State <br />LAKEWOOD <br />5. Zip Code 6. Phone Number <br />80215 <br />7. Operator Name (if different than Permittee) <br />CO <br />8. Mine Name <br />0 - <br />G E C MINERALS INC <br />GEC STRIPMINE <br />25. Hours <br />3.00 <br />3.00 <br />6.00 <br />3.00 <br />a. Permit Review <br />b. Site Visit Time <br />c. Travel Time <br />d. Report Writing <br />26. Signa <br />Date: <br />Signature <br />Elizabeth Shaeffer ID # 377 <br />Printed Name <br />1 09/08/2011 <br />9. Permit Number 10. Permit Type <br />C -81 -037 <br />11. Field Visit Date <br />08/04/2011 <br />mm -dd - yyyy <br />14. Permit Status <br />AB2 <br />17. OSM Office # <br />140 <br />20 M.S.H.A ID # 21.State Code <br />1 05 -00290 <br />23. AVS Permittee Enity ID Number <br />104118 <br />12. Pu .ose 13. SRA Present <br />15. Site Status <br />18. CCID # <br />CO <br />NP <br />16. Facility Type <br />A <br />19. Land Code <br />22. County Name <br />FREMONT <br />24. State Office <br />9/6/11 <br />- -yyyy �--� <br />Is Supplemental MSE Page Used Y ?N l Y <br />Review Date: <br />Signature <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes - Item 12 <br />Oxx... Oversight <br />Axx... Assistance <br />RFx... Reclamation Fees <br />Fxx... Federal Actions <br />CCR... Citizen Compliant Referral (non site <br />CC" Citizen Complaint (initial site visit) <br />CCF Citizen Complaiont Follow -up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 <br />A.... Active: Coal mining and reclamation activities occurring or <br />permitted but not yet disturbed. <br />IN... Inactive (Permanent Program Permit): Phase II completed or <br />Temporary Cessation of Operations. (Ifi(cfim Program Permit) <br />Coal mining completed and reclamation activities initiated <br />BR.. Bond Release: Reclamation completed and State Regulatory <br />Authority (RA) has released all of the bond (Phase III Release.) <br />AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />30 CFR 840.11(g) <br />AB1.. Bond Forfeiture: Bond forfeiture officially in process or completed, and <br />reclamation in progress or not yet commenced. <br />AB2.. Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to <br />reclaim site, but site not reclaimed to Program standards. <br />AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />NA.... Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 <br />ND.. No Disturbance: No coal mining and reclamation <br />operations have been started. <br />EX.. Coal Exploration: Coal exploration operations <br />have started and where coal mining operations <br />have not begun. <br />AP.. Active Coal Producing: Coal surface mining <br />activities are occurring <br />AN.. Active Non - Producing: Active non - producing <br />facility such as tipple or preparation plant. <br />NM.. No Mining: The Permit Status is active, site is <br />not in Temporary Cessation, no surface coal <br />mining activity, and site not regraded. <br />MC.. Mining Complete: No mining activity on site, site <br />regraded and awaiting phase bond release. <br />TC.. Temporary Cessation: The RA has granted <br />cessation of mining pursuant to 30 CFR 816/ <br />817.131(b). <br />P1... Phase I Release: At least Phase I bond release <br />granted for entire permitted area. For interim <br />permits, partial bond release. <br />P2... Phase 1 Release: At least Phase II bond release <br />for the entire permitted area. <br />P3... Phase III Release: Reclamation completed and <br />the RA has released all bond. <br />NS.. Non -Site Visit: Status of site not determined. <br />FP.. Forfeiture Pending: The RA is pursuing <br />actions to revoke the permit, collect the <br />performance bond(s), and /or reclama- <br />tion of forfeited site is in progress. <br />FR.. Forfeited and Reclaimed: Forfeiture <br />reclamation completed. <br />FO.. Abandoned Site: Abandoned site that is <br />permitted but there is no bond. <br />WC. Wildcat: Coal mining and reclamation <br />operations have or are taking place and the <br />activity is not covered by the required <br />permits from the RA. <br />Facility Type Codes - Item 16 <br />A... Surface <br />B... Underground <br />C... Preparation Plant <br />ID... Ancillary (Haulroad, Conveyor, and /or Rails) H... Exploration Permits L.. Remining site permitted <br />E... Refuse and /or Impoundment I... Notice of Intent to Explore under 30CFR785.25 <br />F... Loading Facility and /or Tipple J... Exempt 16 and 2/3 <br />G... Stockpiles K.. Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) <br />and wish to comment on the enforcement or compliance activities of OSM, call 1- 888 -REG -FAIR (1- 888 -734- 3247). <br />1 Page 1 of <br />Revised October 1. 2010 <br />0201 <br />