Laserfiche WebLink
• <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and /or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: <br />Permittee: <br />Street: <br />City: <br />State: <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />C _ 1996 _ 083 <br />Bowie Resources, LLC <br />Bowie No. 2 Mine <br />P.O. Box 483 <br />Paonia <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />CO Zip Code: 81428 <br />Brief Description of Revision: <br />Date: <br />09 / 14 / 2011 <br />Install two gob vent holes. They are numbered GVB -B11C, & <br />B12D. Move three previously approved gob vent holes. <br />Public Notice Attached: Yes _ No ✓ (Required for PRs and TRs) <br />Bond Increase: Yes ✓ No Federal ✓ Non - Federal Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed ( +/ -) _ _ 2 . <br />Permit ( +/ -) _ _ 0 . <br />• Affected ( +/ -) — <br />Mineral Ownership - <br />Mineral Private ( +1 -) <br />Mineral Federal ( +1 -) <br />1 Acres <br />0 Acres <br />0 Acres <br />0 0 Acres <br />0 0 Acres <br />Surface Ownership - <br />Private Land ( +1 -) _ _ 0 . 0 Acres <br />Federal Land ( +1 -) _ _ 0 . 0 Acres <br />State Land ( +1 -) _ _ 0 . 0 Acres <br />Mineral State <br />SEP 14 2011 <br />QtJ S Url UE i-teclamation, <br />( +/ -) _ 0 0 Acres <br />