My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-14_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2011-09-14_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:08 PM
Creation date
9/14/2011 9:44:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
9/14/2011
Doc Name
Letter & Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR124
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ENGINEERING <br />MINE RECLAMATION <br />September 14, 2011 <br />Dear Mr. Dudash: <br />J. E. STOVER & ASSOCIATES, INC. <br />2352NORTH 7 STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />J. J. Dudash <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -124, Two Gob Vent Holes <br />Permit C- 1996 -083 <br />sE 1 r 11 <br />D ► v „9,$�'d� �, eclart On; <br />On behalf of Bowie Resources, LLC, (BRL), enclosed is an application for a minor <br />revision to install two gob vent holes and move three previously approved holes. The <br />new holes are numbered GVB -B11 C & B12D. <br />Background <br />Gob vent holes are required over all Iongwall panels. Six gob vent holes were approved <br />by MR -123. Two were for panel B -11, three for panel B -12 and one was for panel B -13. <br />It was determined that panels B -11 and B -12 need three and four gob vent holes <br />respectively. Therefore, two additional holes are required. In order to space the gob <br />vent holes appropriately, three of the holes approved by MR -123 were moved. <br />GVB Changes <br />The following changes were made to the GVB numbering and location. <br />1. GVB -B1 1A, no change. <br />2. GVB -B11 B, moved to the south. <br />3. GVB -B11 C, new hole in location previously occupied by GVB-B1 1 B. <br />4. GVB -B12A, no change <br />5. GVB -B12B, move to the south. <br />6. GVB -B12C, moved to the south. <br />7. GVB -B12D, new hole in location previously occupied by GVB -B12C. <br />8. GVB -B13A, no change. <br />Changes were made to the tables on Map 9 to reflect this numbering change. <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Right of Entry <br />Right of entry is granted by BRL's Federal Coal lease subject to analysis of impacts by <br />the surface management agency. The two new gob vent holes are located on surface <br />owned by BRL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.