Laserfiche WebLink
1. Person/Permittee <br />1Lntnny d11U oarevy <br />9. Permit Number 10. Permit Type <br />IC- 1981 -010 <br />PP <br />(TRAPPER MINING INC 1 <br />11. Field Visit Date 12. Purpose 13. <br />SRA Present <br />2. Address <br />1 08/30/2011 <br />OB2 <br />Y <br />PO BOX 187 <br />mm - dd - yyyy <br />14. Permit Status 15. <br />Site Status 16. <br />Facility Type <br />3. City 4. State <br />A <br />A <br />A <br />CRAIG <br />ICO <br />17. OSM Office # 18. CCID 4 19. Land Code <br />5. Zip Code 6. Phone Number <br />1140 1 <br />I <br />IF <br />81626 <br />(970) 824 - 4401 <br />20 M.S.H.A ID # 21.State Code 22. County Name <br />7. Operator Name (if different than Permittee) <br />105 -02838 <br />ICO <br />1 IROUTT <br />TRAPPER MINING INC <br />23. AVS Permittee Enity ID Number 24. State Office <br />8. Mine Name <br />90118 <br />I <br />TRAPPER MINE <br />25. Hours <br />26. Signature lock <br />27 ' ew ng fficia <br />�- <br />1 3.00 <br />a. Permit Review <br />Signature <br />Signature <br />Elizabeth Shaeffer ID # 377 <br />1 8.00 <br />b. Site Visit Time <br />Review Date: <br />/ i/ <br />Printed Name <br />1 8.001 c. Travel Time <br />1 m - - yyyy <br />Is Supplemental MSE Page Used Y ?N <br />Date: 109/08/2011 <br />3.00 <br />1 <br />d. Report Writing <br />Permit Type - Item 10 IP = Interim Program PP = Permanent Program , NP = No Permit <br />Purpose Type Codes - item 12 CCR Citizen Compliant Referral (non site <br />Oxx... Oversight RFx... Reclamation Fees CC" Citizen Complaint (initial site visit) <br />Axx... Assistance Fxx... Federal Actions CCF Citizen Complaiont Follow -up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />permitted but not yet disturbed. AB1.. Bond Forfeiture: Bond forfeiture officially in process or completed, and <br />IN... Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2.. Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to <br />Coal mining completed and reclamation activities initiated reclaim site, but site not reclaimed to Program standards. <br />BR.. Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA.... Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 NS.. Non -Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC.. Mining Complete: No mining activity on site, site FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC.. Temporary Cessation: The RA has granted performance bond(s), and /or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1... Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that is <br />AN.. Active Non - Producing: Active non - producing permits, partial bond release. permitted but there is no bond. <br />facility such as tipple or preparation plant. P2... Phase II Release: At least Phase II bond release WC. Wildcat Coal mining and reclamation <br />NM.. No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and the <br />not in Temporary Cessation, no surface coal P3... Phase III Release: Reclamation completed and activity is not covered by the required <br />mining activity, and site not regraded. the RA has released all bond. permits from the RA. <br />Facility Type Codes - Item 16 D... Ancillary (Haulroad, Conveyor, and /or Rails) H... Exploration Permits L.. Remining site permitted <br />A... Surface E... Refuse and /or Impoundment I... Notice of Intent to Explore under 30CFR785.25 <br />B... Underground F... Loading Facility and /or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles K.. Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) <br />OSM, 1- 888 888 734 - 3247). <br />and wish to comment on the enforcement or compliance activities of call -REG -FAIR (1- - <br />I Page 1 of <br />Revised October 1, 2010 <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINI PilVED <br />Mine Site Evaluation SEP 13 2011 <br />State Program Division of keciamation, <br />