Laserfiche WebLink
August 31, 2011 <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted <br />R - Air Resource Protection <br />R - Availability of Records <br />Y - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />Y - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />NA - Other <br />R - Processing Waste <br />C- 1980- 007/West Elk Mine <br />COMMENTS <br />V= Violation Issued NA =Not Applicable <br />R - Roads <br />Y - Reclamation Success <br />Y - Revegetation <br />Y - Subsidence <br />Y - Slides and Other Damage <br />R - Support Facilities On -site <br />Y - Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />R - Topsoil <br />TAK <br />This was a complete inspection conducted by Tom Kaldenbach of DRMS. Kathy Welt represented the operator <br />during the inspection. <br />Selected photographs taken during the inspection are attached to the end of this report. With the operator's <br />consent, this report was issued from the Denver office of DRMS. <br />The longwall face was advancing west near the east end of panel E -3. Development mining was progressing in E- <br />4 gateroad. The ground was dry throughout the site. <br />AIR RESOURCE PROTECTION — Rule 4.17: <br />There were no fugitive dust problems. <br />AVAILABILITY OF RECORDS — Rule 5.02.4(1): <br />All required records were available in the mine office (see attached records check list). The well - <br />organized manner in which the operator maintains the records is highly commendable. <br />HYDROLOGIC BALANCE - Rule 4.05 ❑ ❑Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br />4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage — Acid and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />The inslopes of the following ponds appeared in good condition and the ponds were not discharging: SG- <br />1 (outfall 014), MB -5E, MB -3 (outfall 005), and the wastewater pond . The concrete sediment trap MB -4 at the <br />train loadout (outfall 008) was in good shape, and was not discharging. <br />Construction was completed in 2010 on the following structures that were approved in TR -119: new pond MB- <br />5E, a 48 -inch diameter HDPE pipe that was buried and feeds runoff to pond MB -5E, a bridge across the North <br />Number of Partial Inspection this Fiscal Year, ending 6/30/12: 1 <br />Number of Complete Inspections this Fiscal Year, ending 6/30/12: 1 <br />Page 2 of 8 <br />