Laserfiche WebLink
SEDCAD 4 for Windows <br />r, a tit i ooa nnm 0 -1. 1 <br />• <br />B -Seam Dewaterin <br />10yr - 24hr event <br />Fi i1 <br />Primary spillway on Last Chance Pond is user defined base off <br />of manufacturer data for 1, 0' H Flume (Tracom), <br />Note; Structure #1 (Dewatering Pond #1), SWS #4 was added <br />to simulate the volume of 100 gpm (0,22 cfs) coming from <br />dewatering discharge during the peak storm event. Acreage of <br />this SWS was adjusted to match the increase in flow, <br />Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970 - 675 -4322 <br />Email: sanstedt@yahoo.com <br />• <br />1 <br />Filename: Dewatering model - 1 0yr concrete outlet 5- 11.sc4 Printed 05 -19 -2011 <br />