Laserfiche WebLink
SEDCAD 4 for Windows <br />f:nn.,rinht 1ooR -Onn7 P-1. I Crhu,ah <br />• <br />B -Seam Df <br />ring System <br />25yr - 24hr event <br />Primary spillway on Last Chance Pond is user defined base off <br />of manufacturer data for 1,O' H Flume (Tracom), <br />Note; Structure #1(Dewatering Pond #1), SWS #4 was added <br />to simulate the volume of 100 gpm (0, 22 cfs) coming from <br />dewatering discharge during the peak storm event. Acreage of <br />this SWS was adjusted to match the increase in flow, <br />Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970 - 675 -4322 <br />Email: sanstedt @yahoo.com <br />1 <br />Filename: Dewatering model - 25yr concrete outlet 5- 11.sc4 Printed 05 -19 -2011 <br />