My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-17_PERMIT FILE - C1981018
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2011-06-17_PERMIT FILE - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:35 PM
Creation date
9/12/2011 2:32:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Permit File
Doc Date
6/17/2011
Doc Name
Water Discharge Permit
Section_Exhibit Name
Illustration 46
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page No. 11 <br />Permit No.: CO- 0038024 <br />f. Spontaneous Disappearance <br />• <br />If toxicity spontaneously disappears at any time after a test failure, the permittee shall notify the Division in writing <br />within 14 days of a demonstration of disappearance of the toxicity. The Division may require the permittee to develop <br />and submit additional information, which may include, but is not limited to, the results of additional testing. If no pattern <br />of toxicity is identified or recurring toxicity is not identified, the toxicity incident response is considered closed and <br />normal WET testing shall resume. <br />g. Toxicity Reopener <br />This permit may be reopened and modified (following proper administrative procedures) to include new compliance <br />dates, additional or modified numerical permit limitations, a new or different compliance schedule, a change in the whole <br />effluent toxicity testing protocol, or any other conditions related to the control of toxicants if one or more of the following <br />events occur: <br />i. Toxicity has been demonstrated in the effluent and the permit does not contain a toxicity limitation. <br />ii. The PTI/TIE results indicate that the identified toxicant(s) represent pollutant(s) that may be controlled with specific <br />numerical limits and the permit issuing authority agrees that the control of such toxicants through numerical limits is <br />the most appropriate course of action. <br />iii. The PTI/TIE reveals other unique conditions or characteristics, which, in the opinion of the permit issuing authority, <br />justify the incorporation of unanticipated special conditions in the permit. <br />3. Storm Exemption - Facilities Permitted to Discharge <br />If the permittee intends to use the 10 -year, 24 -hour storm exemption, a report must be submitted to the Division within 90 <br />• days after the effective date of this permit, documenting that the facility is designed, constructed and will be maintained to <br />contain or treat: <br />a. The maximum volume of wastewater which would be generated by the facility during a 24 -hour period without an <br />increase in volume from precipitation; and <br />b. The maximum volume of wastewater resulting from a 10 -year, 24 -hour precipitation event, including the volume which <br />would result from all areas contributing runoff to the individual treatment facility (i.e., all runoff not diverted from the <br />active mining area or the mill area). <br />In addition, if a discharge occurs as a result of the 10 -year, 24 -hour storm volume being exceeded and the permittee wishes to <br />claim an exemption from technology based effluent limitations, the permittee shall submit, within 5 days of the said discharge, <br />documentation that the facility was maintained to contain or treat the previously specified volumes. The permittee must also <br />submit documentation of the storm event, including the precipitation recorded at the closest official precipitation gauge <br />station (or the permittee's own gauge), the volume of runoff produced and the steps taken to maintain treatment and minimize <br />the amount of overflow. <br />For claiming a storm water exemption, the permittee must also adequately demonstrate that all reasonable management, <br />containment, and treatment options have been optimally utilized. <br />The storm event exemptions are only applicable for the following parameters at this facility, which are based upon Federal <br />BAT /BPT.limitations: total suspended solids, total.iron, and/or settleable solids. <br />All data/documentation required by the section which can not be reported on applicable discharge monitoring report forms <br />(DMRs) shall be reported in a letter as an attachment to the DMR. Submittal of documentation of containment, maintenance <br />and'precipitation records above does not exempt the permittee from the notification requiremenfg—ofPaarrll A , 4 oftfiis" <br />• permit. <br />4. Storm Exemption - Facilities Not Permitted to Discharge <br />
The URL can be used to link to this page
Your browser does not support the video tag.