Laserfiche WebLink
Mr. Wallace H. Erickson <br />Response to August 22, 2011 Cazier Memorandum <br />September 9, 2011 <br />Page 13 <br />15. Four and 12 -inch HDPE pipe will be installed in the same trench at a <br />depth of not less than four feet to prevent pipe freezing. See Attachment D -6, Figure D- <br />1. <br />Adequacy Issue No. 19. <br />Page 6, Reporting. The last bullet indicates "as- built" drawings will be prepared in the <br />third quarter of 2011. DRMS recommends this statement be revised such that the <br />schedule is tied to the date site access might be granted and seasonal limitations related <br />to field and construction work. <br />Response to Adequacy Issue No. 19. <br />Wildcat will modify the last bullet of the Reporting section at Page 6 of <br />Attachment D -6 as follows: "'As built' drawings will be prepared and submitted where <br />center lines, cuts and fills have been established 45 days after the work performed <br />pursuant to the Augmentation Pond Construction Work Plan has been completed." <br />As always, please do not hesitate to contact me or George Robinson, at (720) <br />641 -2534, with any questions or concerns. <br />DEN 97, 591, 786v1 9 -9 -11 <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />