My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_REVISION - M1981185 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-09_REVISION - M1981185 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:17 PM
Creation date
9/12/2011 12:15:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/9/2011
Doc Name
Response to Fifth Adequacy Letter
From
R Squared, Inc.
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to Fifth Adequacy <br />September 9, 2011 <br />Page 26 <br />Response to Adequacy Issue No. 11. <br />Response to Adequacy Issue No. 11.a. <br />See contemporaneously submitted Response to August 22, 2011 Hays <br />Memorandum. <br />Response to Adequacy Issue No. 11.b. <br />See contemporaneously submitted Response to August 19 and 22, 2011 Cazier <br />Memoranda. <br />Response to Adequacy Issue No. 11.c. <br />See contemporaneously submitted Response to August 23, 2011 Bird <br />Memorandum. <br />Response to Adequacy Issue No. 11.d. <br />Wildcat is submitting revised work plans which include a thorough description of <br />the process for information collection, analysis, submittal for Division approval and, <br />implementation upon receiving Division approval, and a commitment to submit the <br />newly collected information, updated analysis and resulting finalized designs to the <br />Division through either the Technical Revision or Amendment process. See Response to <br />Hays Memorandum, Adequacy Issue No. 4.a. (Attachment D -1); Response to August 19, <br />2011 Cazier Memorandum, Adequacy Issue No. 2 (Attachment D -2); Response to <br />August 22, 2011 Cazier Memorandum, Adequacy Issue Nos. 1 and 5 (Attachments D -2 <br />and D -3); Response to Bird Memorandum, Adequacy Issue No. Al (Attachment D -5); <br />Response to August 22, 2011 Cazier Memorandum, Adequacy Issue No. 14 (Attachment <br />D -6). Wildcat commits for purposes of any conceptual work plan included in its permit <br />application to submit any newly collected information, updated analysis and resulting <br />finalized designs to the Division through either the Technical Revision or Amendment <br />process. <br />As always, please do not hesitate to call me or George Robinson of R Squared, <br />Inc., at (720) 641 -2534, with any questions or concerns. <br />DEN 97,599,531v1 9 -9 -11 <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.