Laserfiche WebLink
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />(min) <br />1 <br />3600.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.379 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />1 <br />3600.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.281 <br />Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Return Route: <br />Loading Tool unit <br />Production <br />Truck Unit Production <br />Optimal No. of Trucks: 3 Truck(s) <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />277.78 LCY/Hour <br />91.55 LCY /Hour <br />1 <br />Adjusted <br />Adjusted single <br />Adjusted multiple <br />Team(s) <br />$2.989 /LCY <br />Task # 001 <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered <br />Haul Time: <br />Return Time: <br />1.379 <br />1.281 <br />Total Truck Cycle Time: 5.161 <br />Adjusted for job efficiency: <br />Adjusted for job efficiency: <br />Selected Number of Trucks: <br />hourly truck team production: <br />truck/loader team production: <br />truck/loader team production: <br />227.96 <br />227.96 <br />227.96 <br />Total job time: 20.44 <br />Total job cost: $13,926.57 <br />minutes <br />minutes <br />minutes <br />Page 3 of 3 <br />230.56 LCY/Hour <br />75.99 LCY/Hour <br />3 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />