Laserfiche WebLink
Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />1 <br />(Ft) <br />0.00 <br />( %) <br />( %) <br />(fpm) <br />Time ) <br />1 <br />900.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.422 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 <br />900.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.342 <br />Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Return Route: <br />Task # 056 <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />Haul Time: <br />0.422 <br />minutes <br />Loading Tool unit <br />Production <br />Truck Unit Production <br />Optimal No. of Trucks: 2 Truck(s) <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />293.65 LCY/Hour <br />152.99 LCY/Hour <br />1 <br />Adjusted <br />Adjusted single <br />Adjusted multiple <br />Team(s) <br />$2.795 /LCY <br />Return Time: <br />0.342 <br />Total Truck Cycle Time: 3.265 <br />Adjusted for job efficiency: <br />Adjusted for job efficiency: <br />Selected Number of Trucks: <br />hourly truck team production: <br />truck/loader team production: <br />truck/loader team production: <br />380.94 <br />243.73 <br />243.73 <br />Total job time: 27.23 <br />Total job cost: $18,553.29 <br />minutes <br />minutes <br />Page 3 of 3 <br />243.73 LCY/Hour <br />126.98 LCY /Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />