Laserfiche WebLink
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fPm) <br />Travel <br />(min) <br />1 <br />4000.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.520 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fPm) <br />Travel <br />(min) <br />1 <br />4000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.420 <br />Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Loading Tool unit <br />Production <br />Truck Unit Production <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />127.21 LCY/Hour <br />66.99 LCY/Hour <br />Optimal No. of Trucks: 2 Truck(s) <br />1 <br />Adjusted <br />Adjusted single <br />Adjusted multiple <br />Team(s) <br />$6.452 /LCY <br />Task # 048 <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />Haul Time: <br />Return Time: <br />1.520 <br />1.420 <br />Total Truck Cycle Time: 7.900 <br />Adjusted for job efficiency: 105.59 LCY /Hour <br />Adjusted for job efficiency: 55.60 LCY /Hour <br />Selected Number of Trucks: 3 Truck(s) <br />hourly truck team production: 166.80 <br />truck/loader team production: 105.59 <br />truck/loader team production: 105.59 <br />Total job time: 20.14 <br />Total job cost: $13,718.60 <br />minutes <br />minutes <br />minutes <br />Page 3 of 3 <br />LCY /Hour <br />LCY/Hour <br />LCY /Hour <br />Hours <br />CIRCES Cost Estimating Software <br />