My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_APPLICATION CORRESPONDENCE - C2010088
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2011-08-30_APPLICATION CORRESPONDENCE - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:45 PM
Creation date
9/12/2011 11:04:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
8/30/2011
Doc Name
Cost Estimate
From
DRMS
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Haul Road #1, #2 and Access Road <br />Site: Fruita Loadout <br />PROJECT IDENTIFICATION <br />Task #: 021 State: Colorado <br />Date: 30- Aug -11 County: Mesa <br />User: JRS <br />Cost Breakdown: <br />Area: <br />Agency or organization name' DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Ripper Attachment: 1 -Shank Ripper <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $226.27 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 3 acres Rip Depth (ft): 2.00 Volume: 10,906 BCY or CCY <br />Source of estimated quantity: Operator Estimate; Map 15; Page 2.05 -15 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Unit cost: $410.603 Per acre <br />Permit Action: New Permit Permit/Job #: C2010088 <br />$58.82 <br />$117.89 <br />$11.07 <br />$38.49 <br />$226.27 <br />NA feet/second <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />4.05 mph <br />6.08 degrees <br />200.00 feet <br />88.00 feet <br />0.25 feet <br />0.664 acres /hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.664 Acres/hr <br />Site Altitude: 4,500 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.55 Acres /hr <br />Abbreviation: None <br />Filename: C088 -021 <br />Adjusted Hourly Fleet Production: 0.55 Acres /hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 6.13 Hours <br />Total job cost: $1,388.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.