Laserfiche WebLink
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />(min) <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.635 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />(min) <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.550 <br />Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Task # 003 <br />Return Route: <br />Haul Time: <br />Return Time: <br />0.635 <br />0.550 <br />Total Truck Cycle Time: 3.686 <br />Unit cost: $2.955 /LCY Total job cost: $175,912.57 <br />minutes <br />minutes <br />minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 277.78 LCY /Hour Adjusted for job efficiency: 230.56 LCY/Hour <br />Truck Unit Production <br />128.19 LCY /Hour Adjusted for job efficiency: 106.40 LCY /Hour <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 3 Truck(s) <br />Adjusted hourly truck team production: 319.19 LCY /Hour <br />Adjusted single truck/loader team production: 230.56 LCY /Hour <br />Adjusted multiple truck/loader team production: 230.56 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 258.21 Hours <br />CIRCES Cost Estimating Software <br />