Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />015 <br />020 <br />021 <br />030 <br />031 <br />032 <br />033 <br />040 <br />045 <br />046 <br />047 <br />048 <br />049 <br />050 <br />055 <br />056 <br />060 <br />061 <br />062 <br />063 <br />065 <br />070 <br />075 <br />Remove Fill from Haul Road #1 and Place on <br />Facilities Area <br />TRUCK1 <br />■—■ .......... e■-•I e-1 r•-•1 •—■ 1-1 <br />• <br />20.44 <br />$13,926.57 <br />$9,294.79 <br />$175,912.57 <br />$47,448.44 <br />$6,022.05 <br />$11,053.00 <br />$5,174.00 <br />$1,388.00 <br />$239.00 <br />$84.00 <br />$38.00 <br />$699.24 <br />$2,053.00 <br />$4,655.65 <br />$4,655.65 <br />$4,655.65 <br />$13,718.60 <br />$38,786.92 <br />$1,163.91 <br />$15,094.20 <br />$18,553.29 <br />$32,161.75 <br />$9,749.52 <br />$54,879.18 <br />$7,747.18 <br />$307,586.94 <br />$44,598.96 <br />$5,031.31 <br />Remove Fill from Haul Road #2 and Place on <br />Facilities Area <br />TRUCK1 <br />13.64 <br />Remove Fill from Rail Bed and Place on Facilities <br />Area <br />TRUCK1 <br />258.21 <br />Remove Material from Fill Pile and Place on <br />Facilities Area <br />TRUCK1 <br />69.65 <br />Remove Coal Fines from Stockpile and Place in <br />Fill <br />TRUCK1 <br />8.84 <br />Compact Backfilled and Regraded Surfaces <br />COMPACT <br />75.65 <br />Rip Regraded Surfaces Prior to Topsoil <br />Replacement <br />RIPPER <br />22.86 <br />Rip Haul Road #1, #2 and Access Road <br />RIPPER <br />6.13 <br />Regrade Haul Road #1 <br />GRADER <br />2.59 <br />Regrade Haul Road #2 <br />GRADER <br />0.91 <br />Regrade Access Road <br />GRADER <br />0.41 <br />Regrade Light -Use Road #2 <br />DOZER <br />3.17 <br />Finish Grade Disturbed Areas Prior to Seeding <br />GRADER <br />22.33 <br />Regrade Pond 1 <br />DOZER <br />21.09 <br />Regrade Pond 2 <br />DOZER <br />21.09 <br />Regrade Pond 3 <br />DOZER <br />21.09 <br />Remove Fill from Reed Wash Bridge Area to <br />Facilities Area <br />TRUCK1 <br />20.14 <br />Reconstruct Reed Wash at Rail Bridge <br />NA <br />121.22 <br />Regrade Ditches <br />DOZER <br />5.27 <br />Replace Topsoil from Stockpile 1 to Light -Use <br />Road and Rail <br />TRUCK1 <br />22.16 <br />Replace Topsoil from Stockpile 2 to Rail Loop <br />TRUCK1 <br />27.23 <br />Seed All Mine Areas Where Topsoil Was Replaced <br />REVEGE <br />25.40 <br />Hydroseed Reconstructed Reed Wash Bridge Area <br />REVEGE <br />4.00 <br />Seed Remaining Mine Areas <br />REVEGE <br />43.00 <br />Weed Control - Spray Area 3 Times During <br />Liability Period <br />REVEGE <br />102.30 <br />Demolish and Remove All Structures <br />DEMOLISH <br />400.00 <br />Site Maintenance, Rill and Gully Repair and SAE <br />Repair <br />NA <br />168.00 <br />Mobilize /Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />4.00 <br />Task description: <br />Site: Fruita Loadout <br />Fruita Loadout New Permit Summary <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 30- Aug -11 County: Mesa <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY <br />Permit Action: New Permit Permit/Job #: C2010088 <br />Abbreviation: None <br />Filename: C088 -000 <br />