Solid Minerals Inspection Report <br />Bureau of Land Management <br />Dolores Public Lands Office <br />29211 Hwy 184 <br />Dolores, CO 81323 <br />u u A0 1 al <br />DURANgO FIELD OFFICE <br />DIVISION tr RECLAMATION, <br />MINING AND SAFETY <br />Type of Operation <br />Locatable — Notice Level <br />Project Name <br />HD -2 <br />Serial Number <br />COC -74543 <br />Company /Org. <br />Lynx -Royal <br />Inspection Date <br />07/13/2011 <br />Others Present <br />Mike Leidich — LR <br />Ryan Weidert - LR <br />Inspection Time <br />AM <br />Inspected By <br />James Blair <br />Report Date <br />08/24/2011 <br />Legal <br />T42N, R18W, Sec. 12 <br />4 -012_ <br />n <br />Introduction <br />On 7/13/2011 I met with Mike Leidich and Ryan Weidert at the Firehouse in Egnar, Colorado to inspect the <br />HD -2 notice -level drilling program's reclamation. The site had been drilled the previous year. Overall, <br />reclamation was progressing satisfactorily, but a few action items were identified. The location of the <br />project is shown on the attached map. Note that if the project is located nearly adjacent to HD -2, and K1, <br />and should have been treated as a single notice under the 3809 regulations. However, the total <br />disturbance from all three is still well below the 5 acre threshold for a notice (rather than plan of operations). <br />Because of this, no further action is required, however if additional drilling is proposed by Lynx -royal in <br />conjunction with any of these notices, the threshold of 5 acres or less must be maintained, or a plan which <br />incorporates the disturbance for all three should be submitted. It is my understanding that no further <br />activity is expected on any of these projects. <br />Weather was warm and seasonable, with monsoonal moisture building in the afternoon, though it did not <br />rain during the inspection. Moisture thus far in the year had been pretty good, and things were fairly green <br />as is evident in the pictures. <br />Description <br />Only 2 sites were drilled. <br />Site A — Earthwork was good. Some weeds. Needs more time for vegetation to fill in. A stock tank was <br />left on site, presumably by the driller and needs to be removed. There are no identifying marks on the tank. <br />Site B — Looks pretty good. Just needs a little more time. O c brush is coming in nicely. <br />regIfialf <br />James Blair— DPLO Geologist <br />970 - 882 -6862 <br />james_blair @blm.gov <br />Action Items <br />1 of 6 <br />